General information

IMO:
9519303
MMSI:
636019401
Callsign:
A8WQ9
Width:
32.0 m
Length:
189.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Other Ship
Ship type:
Flag:
Liberia
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Anchored
Course:
360.0° / 0.0
Heading:
193.0° / 0.0
Speed:
Max speed:
Status:
anchorage
Area:
Bay of Bengal
Last seen:
2025-02-07
3 min ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
17 hours ago
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-10-25
2024-11-02
7d 22h 55m
2024-10-16
2024-10-24
8d 11h 18m
2024-09-23
2024-10-02
9d 9h 28m
2024-08-06
2024-08-18
11d 23h 34m
2024-07-15
2024-07-18
2d 19h 44m
2024-06-26
2024-06-26
5h 52m
2024-05-26
2024-05-28
1d 11h 16m
2024-04-22
2024-05-24
31d 18h 34m
2024-03-31
2024-04-01
1d 4m
2023-12-24
2023-12-29
4d 19h 13m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Suez
2025-01-10
Enter
Kreta
2025-01-10
Enter
Pantelleria East
2025-01-04
Enter
Sizilien
2025-01-04
Enter
Isla de Alboran
2025-01-01
Enter
Strait of Gibraltar
2024-12-31
Leave
Cape Town
2024-09-20
Leave
Note: All times are in UTC

Latest news

Sold

Mon Mar 25 17:44:54 CET 2019 arnekiel

Conti Holding have sold their Supramax “Almandin” 57/2010 Jiangsu Hantong, China with DD 11/2020 to undisclosed buyers for high USD 9 mill.

New Time Charter

Sun Apr 08 22:11:48 CEST 2018 arnekiel

delivered Mumbai, redelivery Philippines intention petcoke, 12.000 $ daily, Panocean

Crew blamed for broken wires

Sun Apr 27 18:01:07 CEST 2014 Timsen

On Apr 22, 2014, at 2 p.m. the mooring ropes of the "Almandin" broke in the port of Brake all in a sudden. The stern railings were severely damaged when broken off by a wire at the stern. The accident happened when the vessel was passed by another and started to move by the suction. The damage caused was some thousand Euro. The police thought that the bulkcarrier was faulty moored as the crew was unfamiliar with the currents and tide and failed to keep the tension of the wires at bow and aft. The ship left the South Pier in Brake again on Apr 26 bound for Moerdijk with an ETA of Apr 27. German report with photo: http://www.nwzonline.de/wesermarsch/blaulicht/leinen-peitschen-in-die-heck-reling_a_14,7,808490331.html

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data