General information

IMO:
MMSI:
244660016
Callsign:
PD5127
Width:
8.0 m
Length:
80.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Netherlands
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
294.0° / 0.0
Heading:
80.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Oldenburg (Oldenburg)
Area:
Germany
Last seen:
2025-05-15
2 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
4 min ago
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2025-05-14
7h 11m
2025-05-13
2025-05-13
46m
2025-05-13
2025-05-13
1h 7m
2025-05-12
2025-05-13
10h 35m
2025-05-10
2025-05-11
12h 33m
2025-05-10
2025-05-10
52m
2025-05-10
2025-05-10
2h 17m
2025-05-08
2025-05-09
10h 2m
2025-05-08
2025-05-08
1h 34m
2025-04-29
2025-05-06
6d 20h 34m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Delfzijl Gateway
2025-05-13
Leave
Oebisfelde
2025-04-25
Leave
Calvörde Nord
2025-04-25
Leave
Calvörde
2025-04-25
Leave
Bülstringen
2025-04-25
Leave
Groß Ammersleben
2025-04-24
Enter
Rothensee
2025-04-24
Leave
Note: All times are in UTC

Latest news

Fire in engine room

Fri Jul 19 12:58:48 CEST 2013 Timsen

On July 17 at 8.30 p.m. a fire broke out in the engine room of the "Bo Elise" on the Rhine at river km 830. The master remarked smoke but was unable to enter the engine room. He was able to navigate his ship to the dreding hole Eckerfeld, where he docked at the quay of the company Hülskens. He was able to save himself and two more crew members. The fire brigade attended with engines from Haffen-Mehr, Rees and Bienen. Also a boat of the fire rescue was launched at Haffen-Mehr and located the burning ship. After the fire rescue had forced its way onto the Hülskens-area, they ordered the fire boat of the fire brigade Wesel. Also the DLRG attended. The fire rescue was able to extinguish the fire at 10 p.m. The fire was found to have been caused by a technical malfunction. German report with photo: http://www.derwesten.de/staedte/emmerich/schiff-konnte-ins-baggerloch-manoevriert-werden-id8206273.html#1905855905

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data