General information

IMO:
MMSI:
232003370
Callsign:
GJGJ
Width:
27.0 m
Length:
16.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Passenger ship
Ship type:
Flag:
United Kingdom
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Undefined
Course:
0.0° /
Heading:
511.0° /
Speed:
Max speed:
Status:
waiting
Area:
Inner Seas
Last seen:
2025-05-18
20 days ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
20 days ago
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2021-01-21
2021-01-28
7d 1h 34m
2016-06-26
2016-06-30
4d 5m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
-
-
-

Latest news

Ferry suffered issue with ramp

Mon Jun 02 10:39:19 CEST 2025 Timsen

The 'Loch Ranza', serving on the route Taynloan-Gigha, suffered a technical issue with the aft ram pm ;ay 31. As a consequence, p, the ferry was operating single ended. and vehicles may be required to reverse on or off the vessel. The scheduled departures from Tayinloan at 11:00 a.m. and 12:00 p.m. and from Gigha at 11.30 a,m, and 123p.m. were cancelled for investigations into the issue. After it was resolved, the sailings from Tayinloan at 4:00 p.m,. and from Gigha at 4:30 p.m. were reinstated.

Ferry suffered main engine issue

Tue May 13 12:03:21 CEST 2025 Timsen

On May 8, the 'Loch Ranza', serving on the route Tayinloan-Gigha, suffered a technical issue affecting the forward main engine of the ferry, Spares were required to carry out a full repair. As a result, all remaining sailings of the day have been cancelled. After the repairs have been completed, the service was operated again according to timetable on May 9.

Essential investigations on the engine caused cancellations over several days

Wed Mar 19 10:29:41 CET 2025 Timsen

The 'Loch Ranza', serving on the route Tayinloan-Gigha had to undeergo essential investigations on the aft main engine since March 14, As a conseuence, the following sailings had to be cancelled: Departure Tayinloan - 12:00 p.m. Departure Gigha - 12:30 p.m The investigations required onthe engine were still going on throught to March 17, on which the following sailings were cancelled: Departure Tayinloan - 12:00 p.m. Departure Gigha - 12:30 p.m. The service was expected to resume with the 2:00 p.m. departure from Tayinloan. On March 18, the trouble has still not been resolved, and as a consequence the scheduled departures from Gigha at 07:35 a.m., 08:30 a.m., 09:30 a.m., 10:30 a.m. and 11:30 a.m. and from Tayinloan at 08:00 a.m., 09:00 a.m., 10:00 a.m. and 11:00 a.m. had to be cancelled. After the repairs were completed, the ship returned to its schedule on March 19.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data