Allgemeine Informationen

IMO:
MMSI:
232003370
Rufzeichen:
GJGJ
Breite:
27.0 m
Länge:
16.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Passenger ship
Ship type:
Flagge:
United Kingdom
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Undefined
Kurs:
0.0° /
Kompasskurs:
511.0° /
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
waiting
Gebiet:
Inner Seas
Zuletzt empfangen::
2025-05-18
vor 73 Tagen
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 73 Tagen
Source:
T-AIS

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2021-01-21
2021-01-28
7d 1h 34m
2016-06-26
2016-06-30
4d 5m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
-
-
-

Die neuesten Nachrichten

Ferry suffered issue with engine belt

Tue Jul 29 09:15:31 CEST 2025 Timsen

The 'Loch Ranza', serving on the route Tayinloan.Gigha, suffered a technical issue with the engine belt on July 28, rendering the service liable to disruption or cancellation at short notice. The following sailings were cancelled: DepartureTayinloan - 03:00 p.m.; Departure Gigha - 003:30 p.m. After the issue wasresolved, the service was resume at 04:00 p.m.

Ferry suffered issue with ramp

Mon Jun 02 10:39:19 CEST 2025 Timsen

The 'Loch Ranza', serving on the route Taynloan-Gigha, suffered a technical issue with the aft ram pm ;ay 31. As a consequence, p, the ferry was operating single ended. and vehicles may be required to reverse on or off the vessel. The scheduled departures from Tayinloan at 11:00 a.m. and 12:00 p.m. and from Gigha at 11.30 a,m, and 123p.m. were cancelled for investigations into the issue. After it was resolved, the sailings from Tayinloan at 4:00 p.m,. and from Gigha at 4:30 p.m. were reinstated.

Ferry suffered main engine issue

Tue May 13 12:03:21 CEST 2025 Timsen

On May 8, the 'Loch Ranza', serving on the route Tayinloan-Gigha, suffered a technical issue affecting the forward main engine of the ferry, Spares were required to carry out a full repair. As a result, all remaining sailings of the day have been cancelled. After the repairs have been completed, the service was operated again according to timetable on May 9.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data