General information

IMO:
MMSI:
261182657
Callsign:
SR2657
Width:
8.0 m
Length:
80.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Poland
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
257.0° / -128.0
Heading:
511.0° / -128.0
Speed:
Max speed:
Status:
moving
Area:
Germany
Last seen:
2025-08-16
1 day ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
1 day ago
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2025-08-15
2025-08-16
23h 20m
2025-08-13
2025-08-13
2h 39m
2025-08-11
2025-08-12
11h 54m
2025-08-10
2025-08-10
20m
2025-08-10
2025-08-10
4h 39m
2025-08-09
2025-08-10
13h 29m
2025-08-06
2025-08-08
1d 13h 36m
2025-07-31
2025-08-06
6d 5h 10m
2025-07-29
2025-07-30
19h 5m
2025-07-27
2025-07-28
13h 41m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Elsfleth
2025-08-16
Enter
Elsfleth
2025-08-16
Leave
Lemwerder
2025-08-16
Leave
Bremen
2025-08-16
Leave
Bülstringen
2025-08-11
Leave
Groß Ammersleben
2025-08-11
Enter
Hohenwarthe
2025-08-11
Enter
Note: All times are in UTC

Latest news

Bridge allision on Hunte River

Mon Aug 18 09:36:49 CEST 2025 Timsen

On 'the afternoon of Aug 16, 2025, the 'Anna', en route from Bremen, allided with the railway bridge at the Oldenburg port on the Hunte River, while sailing upstream toward the Coast Canal. The impact severe damage to thewheelhouse, as well as to a car stored behind it, which was displaced but did not fall into the water. Mo one was injured, and no pollutants leaked out. Only paint rubbed off the underside of the rolling bascule bridge, whbich was not raised at the time of the accident. The Bremen Traffic Control Center has banned the 'Anna' from sailing. The Brake Water Police have taken over the investigation into the cause of the accident. The railway bridge was closed to rail traffic for approximately two hours. This affected the RE1 regional train from Norddeich to Bremen Central Station, as well as the RS3 line (Bad Zwischenahn/Wilhelmshaven-Bremen) operated by Nordwestbahn. After an inspection by the Waterways and Shipping Administration and German Rail, the line was finally reopened in the afternoon. The captain had probably misjudged the clearance height of the closed bascule bridge. Report with photo: https://www.nwzonline.de/region/bahnstrecke-in-oldenburg-sperrung-zwischen-hude-und-oldenburg-wegen-beschaedigter-eisenbahnbruecke-aufgehoben_a_4,2,1710990472.html

crashed into Railway Bridge

Sun Aug 17 11:26:53 CEST 2025 BerndU

crashed into Oldenburg Railway Bridge 16.08.25 https://www.ndr.de/nachrichten/niedersachsen/oldenburg_ostfriesland/schiffskollision-in-oldenburg-bahnstrecke-zwei-stunden-gesperrt,oldenburg-126.html

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data