Allgemeine Informationen

IMO:
MMSI:
261182657
Rufzeichen:
SR2657
Breite:
8.0 m
Länge:
80.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Cargo Ship
Ship type:
Flagge:
Poland
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
15.8° / -128.0
Kompasskurs:
511.0° / -128.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moving
Gebiet:
Germany
Zuletzt empfangen::
2025-09-07
vor 42 Min
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 1 Std
Source:
T-AIS

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2025-09-06
2025-09-06
5h 26m
2025-09-05
2025-09-06
11h 52m
2025-09-04
2025-09-05
14h 26m
2025-09-03
2025-09-04
14h 57m
2025-08-30
2025-09-03
3d 23h 33m
2025-08-28
2025-08-29
17h 49m
2025-08-28
2025-08-28
2h 31m
2025-08-25
2025-08-27
1d 18h 34m
2025-08-19
2025-08-21
2d 54m
2025-08-15
2025-08-16
23h 20m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Hohenwarthe
2025-09-06
Abfahren
Groß Ammersleben
2025-09-06
Abfahren
Bülstringen
2025-09-05
Ankommen
Calvörde
2025-09-05
Ankommen
Bremen
2025-08-28
Ankommen
Lemwerder
2025-08-28
Ankommen
Elsfleth
2025-08-16
Ankommen
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Bridge allision on Hunte River

Mon Aug 18 09:36:49 CEST 2025 Timsen

On 'the afternoon of Aug 16, 2025, the 'Anna', en route from Bremen, allided with the railway bridge at the Oldenburg port on the Hunte River, while sailing upstream toward the Coast Canal. The impact severe damage to thewheelhouse, as well as to a car stored behind it, which was displaced but did not fall into the water. Mo one was injured, and no pollutants leaked out. Only paint rubbed off the underside of the rolling bascule bridge, whbich was not raised at the time of the accident. The Bremen Traffic Control Center has banned the 'Anna' from sailing. The Brake Water Police have taken over the investigation into the cause of the accident. The railway bridge was closed to rail traffic for approximately two hours. This affected the RE1 regional train from Norddeich to Bremen Central Station, as well as the RS3 line (Bad Zwischenahn/Wilhelmshaven-Bremen) operated by Nordwestbahn. After an inspection by the Waterways and Shipping Administration and German Rail, the line was finally reopened in the afternoon. The captain had probably misjudged the clearance height of the closed bascule bridge. Report with photo: https://www.nwzonline.de/region/bahnstrecke-in-oldenburg-sperrung-zwischen-hude-und-oldenburg-wegen-beschaedigter-eisenbahnbruecke-aufgehoben_a_4,2,1710990472.html

crashed into Railway Bridge

Sun Aug 17 11:26:53 CEST 2025 BerndU

crashed into Oldenburg Railway Bridge 16.08.25 https://www.ndr.de/nachrichten/niedersachsen/oldenburg_ostfriesland/schiffskollision-in-oldenburg-bahnstrecke-zwei-stunden-gesperrt,oldenburg-126.html

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data