Allgemeine Informationen

IMO:
9408413
MMSI:
316014054
Rufzeichen:
CFN5364
Breite:
24.0 m
Länge:
151.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Passenger ship
Ship type:
Flagge:
Canada
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
122.7° / 127.0
Kompasskurs:
124.0° / 127.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moving
Gebiet:
North America West Coast
Zuletzt empfangen::
2024-07-13
vor 1 Min
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 8 Std
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-07-12
2024-07-12
1h 48m
2024-07-12
2024-07-12
5h 27m
2024-07-10
2024-07-10
8h 27m
2024-07-08
2024-07-08
7h 35m
2024-07-06
2024-07-06
2h 3m
2024-07-06
2024-07-06
5h 1m
2024-07-04
2024-07-04
1h 47m
2024-07-04
2024-07-04
5h 19m
2024-07-02
2024-07-02
7h 57m
2024-06-30
2024-06-30
2h 6m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
-
-
-

Die neuesten Nachrichten

Ferry slowed down by turbocharger issues

Thu Sep 13 18:48:13 CEST 2018 Timsen

On Sep 11, 2018, BC Ferries announced that the "Northern Expedition" was having trouble with the turbocharger in its starboard engine. While it could still sail safely, it moved several knots slower than usual when sailing between Prince Rupert and Port Hardy from Sep 11 to Sep 13. It has been reported that, the vessel will keep close to its schedule, although may arrive a few hours later than planned. BC Ferries has ordered parts to fix the issue, and a technical team from Richmond will install them in Prince Rupert on Sep 14. However, BC Ferries was not 100 per cent sure the parts will arrive on time.Passengers planning a sail down the Inside Passage on Sep 14, were now being pushed back by 11 hours. The "Northern Expedition" was supposed to leave at 07.30 a.m. and the "Northern Adventure" from Haida Gwaii was slotted for 11 a.m. But now, the vessels are being swapped for the work on the "Northern Expedition". The 07.30 a.m. sailing was expected to leave on time, but the 11 a.m. voyage is anticipated to leave at 10 p.m. that night instead.

Ferry sidelined due to turbocharger damage

Tue Aug 07 10:15:09 CEST 2018 Timsen

BC Ferries cancelled sailings from Prince Rupert to Haida Gwaii on Aug 5 and 6, 2018, and planned to restart the service on Aug 7 with the "Northern Adventure" at 6 a.m. from Prince Rupert and a 4 p.m. from Skidegate. On Aug. 8, another sailing will depart Prince Rupert at 10 p.m. with a 10 p.m. return trip from Haida Gwaii. In the evening of Aug 4, a failed turbocharger on the "Northern Expedition" forced the captain to skip a stop in Klemtu, where it was unsafe to sail with a single engine. Instead, the "Northern Expedition" sailed directly to Prince Rupert, where a specialist technician and new parts were available. BC Ferries hoped the repairs would be finished on Aug 6 around midnight with sea trials to follow. If the repairs did not work as planned, the "Northern Adventure" will continue to service Haida Gwaii, with the result that sailings will be lost on the Prince Rupert-Port Hardy route. BC Ferries also contracted a tug and barge to carry freight from Haida Gwaii to the mainland on Aug 6.

Rising Bunker Prices Drive up Ferry Fares

Sun Jan 05 01:00:27 CET 2014 arnekiel

BC Ferries will raise its fares on most routes by 3.5 percent this month to pay for rising diesel fuel costs, Canadian news service CBC News reports. "We have waited as long as we can to implement a surcharge, however we must act now as it is clear that fuel prices are unlikely to decline in the foreseeable future," said CEO Mike Corrigan. "We are well aware that implementing a fuel surcharge is unpopular with our customers, and we are doing everything we can to keep our fuel costs as low as possible, including building new ships with LNG [liquefied natural gas] capability." Corrigan said BC Ferries has reduced its fuel use by 5.8 million litres since 2004, but its fuel costs still rose to CAD121 million ($114 million) from CAD50 million ($47 million) over that period He added that every 1 percent increase in fuel prices adds CAD1.2 million ($1.1 million) to the company's expenses. http://shipandbunker.com/news/am/218455-rising-bunker-prices-drive-up-ferry-fares

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data