Allgemeine Informationen

IMO:
9085974
MMSI:
232002521
Rufzeichen:
MVNP4
Breite:
18.0 m
Länge:
101.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Passenger ship
Ship type:
Flagge:
United Kingdom
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
300.2° / -127.0
Kompasskurs:
296.0° / -127.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moving
Gebiet:
Inner Seas
Zuletzt empfangen::
2025-08-23
vor 2 Std
 
Source:
T-AIS
Von:
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 3 Std 
Source:
T-AIS

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2025-08-23
2025-08-23
1h 8m
2025-08-22
2025-08-22
46m
2025-08-21
2025-08-21
3m
2025-08-20
2025-08-20
1h 45m
2025-08-19
2025-08-19
2h 17m
2025-08-18
2025-08-18
1h 29m
2025-08-17
2025-08-17
1h 24m
2025-08-16
2025-08-16
53m
2025-08-15
2025-08-15
3h 10m
2025-08-14
2025-08-14
1h 23m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Liverpool Approach
2021-04-04
Ankommen
Liverpool Approach
2021-03-22
Abfahren
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Ferry suffered issue with bow visor

Tue Aug 19 21:03:35 CEST 2025 Timsen

The 'Isle of Lewis', serving on the route Oban-Castlebay, suffered an issue with the bow visor in the port of Oban on Aug 19. As a consequence, the scheduled 1.10 p.m. sailing from Oban iwas delayed. After the issue was resolved, the 'Isle Of Lewis' finally departed Oban at 2:00 p.m.

Ramp and propulsion trouble

Tue Aug 19 10:12:50 CEST 2025 Timsen

The 'Isle of Lewis', serving on the route Oban-Castlebay, suffered a technical issue with the ramp on Aug 15 and a potential fouled propeller. Both problems required further inspections, and the departure from Castlebay was at 05:30 a.m. and the arrival at Oban at 10:15 a.m. as a consequence.

Technical issue caused delays

Wed Jun 11 21:12:29 CEST 2025 Timsen

Due to a technical issue with the 'Isle of Lewis', serving on the route Oban-Castlebay, on June 11, the scheduled departure from Oban at 1:10 p.m. was delayed, while further investigations took place. After the repairs have been successfully completed, the vessel finally departed from Oban at 5:50 p.m. The 'Loch Alainn' delayed the following sailings in order to provide onward connections: Departure Barra - 11:15 p.m. (late 7:20 p.m.) Departure Eriskay - 1:05 a.m. (late 08:15 p.m.).

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data