Allgemeine Informationen

IMO:
8219554
MMSI:
235104000
Rufzeichen:
GDMJ
Breite:
16.0 m
Länge:
84.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Passenger ship
Ship type:
Flagge:
United Kingdom
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
227.0° / 0.0
Kompasskurs:
225.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moving
Gebiet:
Inner Seas
Zuletzt empfangen::
2025-08-16
vor 1 Tag
Source:
T-AIS
Von:
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 1 Tag
Source:
T-AIS

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2025-08-13
2025-08-13
15m
2025-07-24
2025-07-24
57m
2025-07-23
2025-07-24
10h 46m
2025-07-23
2025-07-23
24m
2025-07-23
2025-07-23
32m
2025-07-23
2025-07-23
34m
2025-07-23
2025-07-23
35m
2025-07-22
2025-07-23
10h 48m
2025-07-22
2025-07-22
22m
2025-07-22
2025-07-22
28m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
-
-
-

Die neuesten Nachrichten

Sailings cancelled due to sewage system issues

Tue Jul 29 13:40:51 CEST 2025 Timsen

The 'Isle of Arran', serving on the route Kennacraig-Islay, suffered a technical issue impacting the sewage system on July 28, As a consequence, the scheduled departures from Kennacraig at 10:00 a.m. and03:30 p.m. and from Port Ellen at 12:45 p.m. and 06:00 p.m. have been cancelled to carry out repairs. Due to the ongoing issue with the sewage system, more sailings had to be cancelled on July 29: Departure Port Askaig – 07:00 a.m.; Departure Kennacraig – 10:00 a.m.; Departure Port Ellen – 12:45 p.m. The ferry 'Finlaggan' continued as a replacement ship and operated the following sailings: Departure Kennacraig – 07:00 a.m. Departure Port Ellen – 09:45 a.m. After the 'Isle of Arran’s sewage system was repaired. the ferry resumed service on Juily 29 at 1:00 p.m., departing from the port of Kennacraig.

Ferry suffered technical issue of firefighting system

Tue Jul 22 09:52:46 CEST 2025 Timsen

The 'Isle of Arran', serving on the route Ardrossan -Brodick, suffered a technical issue affecting the firefighting system which required the attendance of contractors on July 20. As a consequence, all sailings were liable to disruption or cancellation at short notice. The scheduled departures from Ardrossan at 09:45 a.m. and from Brodick at 11:05 a.m. were cancelled, and the ferry remained sidelined in Ardrossan. She finally returned to service on the morning July 21. However, the passenger capacity had the be reduced until a full repair can be carried out. As a result, the space was limited, and customers were advised to book in advance. As of July 22, the passenger numbers were back to capacity, and the ferry was also able to take on board dangerous goods vehicles However, the following shuttle buses remained in place to take passengers to and from Ardrossan: Departure Ardrossan: 12:20 p.m., 5:30 p.m. Departure Troon: 11:10 a.m., 4:45 p.m., 9:40 p.m.

Water ingress in cafeteria

Wed Jun 25 09:31:43 CEST 2025 Timsen

Due to a technical issue with water ingress in the Mariners cafeteria aboard the 'Isle of Arran', serving on the route Kennacraig-Port Askaig-Port Ellen, on June 24, there was no hot food service or seating available in this area until further notice.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data