Rauma

Allgemeine Informationen

Name:
Rauma
Land:
Finland
UN/Locode:
FIRAU
Local time:
Festgemachte Schiffe:
23
Erwartete Schiffe:
5
Liegeplätze:
6
Koordinaten:
N 61° 08' E 021° 26'

Festgemachte Schiffe

Name
Type
Moored
Frachtschiff
31.10. 10:45
Frachtschiff
06.11. 23:54
Frachtschiff
07.11. 04:30
Passagierschiff
29.08. 08:52
Frachtschiff
06.11. 08:52
Frachtschiff
06.11. 05:37
Frachtschiff
05.11. 05:00
Unklassifiziert
22.10. 08:25
Schlepper
03.11. 01:02
Unklassifiziert
21.10. 11:40

Erwartete Schiffe

Name
Typ
Erwarted
Frachtschiff
08.11. 03:00
Frachtschiff
08.11. 05:30
Frachtschiff
09.11. 08:00
Tanker
10.11. 06:00

Ausgelaufene Schiffe

Name
Typ
Ausgelaufen
Frachtschiff
07.11. 00:08
Frachtschiff
06.11. 22:03
Frachtschiff
06.11. 08:25
Frachtschiff
05.11. 17:43

Die neuesten Nachrichten

Rauma Shipyard bags Finnish Navy's four corvettes order

Sat Sep 21 15:08:47 CEST 2019 arnekiel

Rauma Marine Construction says that four new multipurpose corvettes for the Finnish Navy will be constructed at Rauma shipyard. The design phase will resume with immediate effect and construction of the first vessel will start at the shipyard in 2022. The Finnish Government approved the procurement, valued at approximately EUR 700 million. Rauma Marine Constructions Oy and the Finnish Defence Forces will formally sign the agreement for the construction of the multipurpose corvettes on September 26, 2019. CEO Jyrki Heinimaa is pleased that Rauma’s long traditions of building Finnish naval ships will continue.

Port of Rauma: First parts of the port investments ready. New yard & quay side in use at container terminal

Fri Aug 18 13:12:52 CEST 2017 arnekiel

Construction at the Port of Rauma container terminal is progressing well. First part (60 meters) of the new container quay was taken in use on Monday August 14th, 2017. After the addition, the total length of the container quay is now 215 meters.The container quay will be extended to 520 meters within the rest of the year 2017. “We are very satisfied with the new quay side and container yard which was now finished. Quay side operations will get more efficient as the gantry cranes will reach further out. Now we can handle even the longest vessels at the container quay” sums up operations director Mr. Juha Rehmonen (Euroports Rauma Ltd). Managing director Mr. Hannu Asumalahti (Port of Rauma Ltd) points out that connecting the existing container quay with new parts is one of the most challenging parts of the project. Therefore a major milestone has been passed as this part of the quay side is finished and taken into use. “Moreover, it’s important to take into use areas that the port customers can utilize right away through improved terminal operations. The traffic volumes have been positive in 2017, which means that the large port investment will be finished at a suitable time. The container terminal expansion started in the spring 2016 and most of the work will be finished by the end of 2017. The total cost of the project is 25 M€. Alongside the container terminal extension, also the Rauma channel will be dredged from 10 meters to 12 meters maximum authorized draught in cooperation with the Finnish Transport Agency. The dredging will will also be finished by the end of 2017.

News schreiben