General information

IMO:
9390123
MMSI:
314633000
Callsign:
8PBK8
Width:
12.0 m
Length:
88.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Barbados
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
160.7° / 127.0
Heading:
159.0° / 127.0
Speed:
Max speed:
Status:
moving
Area:
North Sea
Last seen:
2024-10-03
3 hours ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
5 hours ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-09-30
2024-10-02
1d 12h 59m
2024-09-20
2024-09-23
2d 8h 27m
2024-09-14
2024-09-14
23m
2024-09-13
2024-09-14
1d 1h 30m
2024-09-13
2024-09-13
38m
2024-09-11
2024-09-12
1d 8h
2024-09-08
2024-09-09
16h 21m
2024-09-04
2024-09-07
2d 16h 41m
2024-08-26
2024-08-29
3d 9h 55m
2024-08-23
2024-08-24
12h 27m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Ijmuiden Approach
2024-09-14
Enter
Amsterdam Breakwaters
2024-09-14
Leave
IJmuiden
2024-09-14
Leave
Ijmuiden Sourth Locks
2024-09-14
Enter
Velsen Zuid
2024-09-14
Leave
Spaarndam
2024-09-14
Leave
Spaarndam
2024-09-13
Enter
Note: All times are in UTC

Latest news

Nestor aground in Limerick

Mon Nov 25 17:41:56 CET 2013 Timsen

The "Nestor" ran aground after leaving the docks at Limerick on Nov 24, 2013. The vessel was refloated by a tug boat at high tide on Nov 25 morning after spending the night stuck on mud between Limerick Port and Barringtons Pier. There was no environmental damage arising from the grounding which occurred shortly after the Nestor left port with a load of scrap metal at 10.30 p.m. The duty harbour master immediately mobilised the Shannon Foynes Port Company multi-purpose workboat, the "Multicat Shannon 1" to try re-float the vessel but this proved unsuccessful due to an ebb Tide. The tug "Celtic Rebel" was deployed from Foynes to assist and the Nestor was successfully refloated at approximately 11 a.m. and made her way downriver to Foynes. There was no apparent damage and no environmental impact, though the vessel was to be assessed by at Foynes by Port State Control. Pending clearance, it was expected to sail for Barreiro on Nov 26. Shannon Foynes Port Company fully examined the area where the ship ran aground to determine if any additional siltation has occurred and, if necessary, remedial action will be taken. Report with photo: http://www.limerickleader.ie/news/local-news/no-environmental-impact-after-ship-runs-aground-1-5706122

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data