General information

IMO:
9197478
MMSI:
255915615
Callsign:
CQ2073
Width:
20.0 m
Length:
152.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Portugal
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
41.0° / 0.0
Heading:
42.0° / 0.0
Speed:
Max speed:
Status:
moving
Area:
South China Sea
Last seen:
2025-05-05
22 hours ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
2 days ago
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2025-05-02
2025-05-03
20h 18m
2025-05-01
2025-05-02
16h 35m
2025-04-03
2025-04-03
9h 15m
2025-03-28
2025-03-31
3d 1h 33m
2025-03-22
2025-03-24
2d 9h 44m
2025-03-14
2025-03-18
4d 11h 50m
2025-03-11
2025-03-12
1d 53m
2025-03-08
2025-03-09
1d 15h 43m
2025-03-04
2025-03-07
2d 9h 22m
2025-02-28
2025-03-04
3d 23h 26m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Kukup Island
2025-05-01
Leave
Malacca Straits - Port Klang
2025-05-01
Leave
Malacca Straits - Penang Island
2025-04-30
Leave
Malacca Straits - North
2025-04-30
Enter
Cape Town
2025-04-15
Enter
Canary Islands
2025-04-03
Enter
Fuerteventura
2025-04-03
Enter
Note: All times are in UTC

Latest news

SIEMENS ships turbines to Beni Suef onboard of Wiebke via Adabya port

Wed Feb 24 09:01:06 CET 2016 arnekiel

German engineering conglomerate Siemens said it will move an 890-ton shipment of gas turbines from Berlin Westhafen port to the Beni Suef power plant project in Egypt. The consignment consists of two SGT5-8000H gas turbines and will take three months to complete. The turbines are scheduled to be shipped via the port of the Rotterdam and Adabiya on the Red Sea before being installed at the plant in mid-May."We expect the plant in Beni Suef to feed electricity into the Egyptian power grid as early as the winter of 2016-2017. Siemens is helping its Egyptian partner to build a powerful, reliable power supply system with proven power plant technology,” said Willi Meixner, Siemens Power and Gas CEO. Each turbine measures 12.6 meters long and 5.5 meters in diameter. Two cranes will be required for each unit to load them onto barges at the Port of Rotterdam, before being loaded onto the heavy-lift ship Wiebke. After arrival at the port of Adabiya, the turbines will be lifted onto a 40-axle trailer which will be used to transport the turbines the rest of the 250-kilometer route along the Nile to the Beni Suef plant. http://www.breakbulk.com/siemens-ships-890t-turbines-to-beni-suef/

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data