General information

IMO:
8985969
MMSI:
246343000
Callsign:
PHCT
Width:
8.0 m
Length:
18.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Tug
Ship type:
Flag:
Netherlands
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
213.7° / -128.0
Heading:
511.0° / -128.0
Speed:
Max speed:
Status:
moored
Location:
Delfzijl (Havenbrug)
Area:
Netherlands
Last seen:
2025-02-12
< 1 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
1 min ago
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2025-02-01
10d 22h 37m
2025-01-20
2025-02-01
11d 15h 47m
2025-01-14
2025-01-20
5d 19h 11m
2025-01-14
2025-01-14
1h 24m
2025-01-13
2025-01-14
21h 42m
2025-01-13
2025-01-13
3h 41m
2024-12-16
2025-01-13
28d 5h 33m
2024-12-12
2024-12-15
3d 2h 12m
2024-11-11
2024-12-12
31d 3h 8m
2024-11-11
2024-11-11
43m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Delfzijl Gateway
2025-02-01
Enter
Delfzijl Gateway
2025-02-01
Leave
Delfzijl Gateway
2025-01-20
Enter
Delfzijl
2025-01-20
Enter
Delfzijl
2025-01-20
Leave
Delfzijl Gateway
2025-01-20
Leave
Delfzijl Gateway
2025-01-14
Enter
Note: All times are in UTC

Latest news

Allision on the Ems

Sat Mar 19 21:17:08 CET 2016 Timsen

On Mar 19, 2016, around 6 a.m. a convoy consisting of the tugs "Gruno 2“, "Gruno 4“ and "Waterstad“ and a barge with a 4500-tons-engine room section of the cruise ship "Norwegian Joy", presently under construction at the Meyer Yard in Papenburg, allided with a dolphin on the Ems near Ditzum and later in Leer. After another tug assisted, the transport could be continued to Papenburg. The Ems between Leer and Papenburg had been barred for the transit which was delayed for two hours due to the incident. Reports with photos: http://www.noz.de/lokales/papenburg/artikel/686235/ems-wird-fur-kreuzfahrtschiff-sektion-gesperrt-1#gallery&0&0&686235 http://www.tugspotters.com/site/content/2016/03/nieuw-scheepsdeel-voor-meyer/ http://www.noz.de/lokales/papenburg/artikel/686949/brucke-in-leer-gerammt-sektion-fur-kreuzfahrtschiff-beschadigt?utm_source=Facebook&utm_medium=Link&utm_campaign=Artikel_teilen#gallery&0&2&686949

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data