General information

IMO:
8132031
MMSI:
237023300
Callsign:
SV6437
Width:
6.0 m
Length:
35.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Passenger ship
Ship type:
Flag:
Greece
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Undefined
Course:
19.8° / -128.0
Heading:
511.0° / -128.0
Speed:
Max speed:
Status:
waiting
Area:
Greece
Last seen:
2024-10-05
16 hours ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
16 hours ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-10-05
16h 57m
2024-10-05
2024-10-05
22m
2024-10-05
2024-10-05
14m
2024-10-05
2024-10-05
6m
2024-10-05
2024-10-05
7m
2024-10-05
2024-10-05
15m
2024-10-05
2024-10-05
7m
2024-10-05
2024-10-05
7m
2024-10-04
2024-10-05
15h 37m
2024-10-04
2024-10-04
6m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
-
-
-

Latest news

Technical trouble in Piraeus

Mon Sep 23 10:26:24 CEST 2024 Timsen

On the afternoon of Sep 21, the Port Authority of Argosaronicos was informed by the Master of the ‘Flying Dolphin Venus 1’, that after berthing at the port of Piraeus, the port side axle suffered technical trouble. The ship had a scheduled itinerary for the ports of Aegina and Agistrio with 56 passengers on board. It was banned from sailing by the Port of Argosaronicos, until the repair of the damage and the presentation of a certificate of class maintenance by the monitoring classification. The passengers were forwarded to their destination by the company.

Ship under repair after bow issue

Mon Sep 16 10:37:06 CEST 2024 Timsen

On the afternoon of Sep 14, the Port Authority of Aegina was informed by the Master of the 'Venus 1', that a loud noise was detected in the port side bow area of the ship, while it was sailing from the port of Agistrio to the port of Aegina. The ship sailed safely to the port of Aegina. The Port Authority of Aegina initially prohibited the sailing of the hydrofoil, until the damage was repaired and a certificate of class maintenance was presented by the classifier monitoring it, and then it was granted a license to carry out a single voyage,without cargo and passengers, for the repair base in Perama. The 41 passengers bound for Piraeus were forwarded by the owner company.

Main engine trouble after yard maintenance

Tue Sep 12 10:07:33 CEST 2023 Timsen

The Port Authority of Perama was informed in the evening of Sep 11, 2023, by the Master of the 'Flying Dolphin Venus I", that en route from Perama to Agistri following a maintenance, a malfunction was found in the port side main engine before starting the scheduled route from the port of Agistrio to the ports of Aegina and Piraeus. The Perama Port Department of the Central Port Authority of Piraeus prohibited the ship from sailing, until the damage was repaired. The affected passengers were informed by the ship's owning company.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data