General information

IMO:
9030503
MMSI:
305477000
Callsign:
V2QV4
Width:
11.0 m
Length:
75.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Antigua and Barbuda
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
269.0° / -127.0
Heading:
270.0° / -127.0
Speed:
Max speed:
Status:
moving
Area:
North Sea
Last seen:
2024-08-30
8 hours ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
9 hours ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-08-29
2024-08-30
3h 3m
2024-08-29
2024-08-29
48m
2024-08-29
2024-08-29
1h 48m
2024-08-26
2024-08-28
1d 22h 55m
2024-08-25
2024-08-25
54m
2024-08-25
2024-08-25
1h 2m
2024-08-20
2024-08-21
1d 48m
2024-08-16
2024-08-16
12h 10m
2024-07-20
2024-07-22
2d 7h
2024-07-13
2024-07-17
3d 23h 8m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Wangerooge
2024-08-30
Leave
Elbe 1
2024-08-30
Leave
Cuxhaven
2024-08-30
Leave
Brunsbuettel Schleuse
2024-08-30
Enter
NOK Hochdonn
2024-08-29
Enter
Note: All times are in UTC

Latest news

Steering gear repaired

Fri Jan 31 12:31:07 CET 2020 Timsen

On Jan 29, the 'Valiant' has returned to service after having suffered steering trouble enroute from Poole on Jan 25 off the coast of Herm. Specialist engineers were called to rectify the steering gear and carry out further repairs on one of the schottels, which was part of the steering system. The ship left Guernsey at 9 a.m. and arrived in St Helier just after 1 p.m. the same day.

Freighter suffered rudder trouble

Mon Jan 27 12:51:32 CET 2020 Timsen

The 'Valiant' encountered steering problems during its voyage from Poole, where it had sailed at 5.40 p.m. towards the Channel Islands in the night of Jan 25, 2020, and the issue became exaggerated as it neared Herm on Jan 26. The tug 'Duke of Normandy', the pilot boat 'Golden Spur' from Guernsey and the iwork boat 'Sarnia' assisted the 'Valiant' into port in deteriorating weather conditions. A towing connection was established just outside Guernsey's port, and the 'Duke of Normandy' towed it safely into St. Peter Port at 2.36 p.m.

Crane snapped during loading operation

Wed Aug 08 10:18:30 CEST 2012 Timsen

A part of an Alderney Harbour crane snapped while it was loading the "Valiant" with supplies at Braye Harbour on Aug 7, 2012, at about 09:00 a.m. The jib holding the hook snapped. No-one had been hurt and the situation was under control, with another crane having taken over the operation. A subsequent freight arrival to Guernsey would be delayed by about three hours as a result of the incident. The freight deliveries to Alderney were expected to be back on schedule by Aug 8. Report with photo: http://www.bbc.co.uk/news/world-europe-guernsey-19166266

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data