General information

IMO:
MMSI:
367420440
Callsign:
WDE9718
Width:
44.0 m
Length:
416.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Other Ship
Ship type:
Flag:
United States of America
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Undefined
Course:
58.1° / 0.0
Heading:
53.0° / 0.0
Speed:
Max speed:
Status:
moving
Area:
United States
Last seen:
2024-10-04
1 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
19 hours ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-10-04
2024-10-04
1h 11m
2024-09-30
2024-10-03
2d 22h 39m
2024-09-25
2024-09-25
1h 14m
2024-09-25
2024-09-25
16m
2024-09-23
2024-09-23
1h 17m
2024-09-22
2024-09-22
3h 26m
2024-09-21
2024-09-22
1d 9m
2024-09-20
2024-09-21
2h
2024-09-20
2024-09-20
2h 12m
2024-09-20
2024-09-20
1h 13m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
-
-
-

Latest news

NTSB report in allision published

Wed Apr 03 11:55:05 CEST 2024 Timsen

The allsion of the 'Susan K', which was transiting with 25 barges downbound on the Mississippi River toward the Natchez-Vidalia Bridge on April 23, 2023, with a bridge pier was caused by inattentiveness by the veteran Mississippi River towboat captain, who had 45 years of experience, resulting in the tow contacting a bridge pier and $2 million in damage, the National Transportation Safety Board reported on April 2, 2024. The 'Susan K' was downbound toward the Natchez-Vidalia Bridge around 10:42 p.m. on April 23, 2023, headed for the western channel under the bridge. But the captain’s attention slipped during the approach. “he tow was out of position for the intended route and the captain’s awareness of the situation came too late to avoid striking a bridge pier. The investigators found no evidence that the captain was fatigued, impaired or distracted. They noted the captain had decades of experience steering towing vessels and maneuvering tows, including hundreds of transits through the Natchez-Vidalia Bridge. Interviewed by investigators, the captain said his attention lapsed after rounding the river bend above the bridge, and too late he realized that he was way off his marks. Trying to recover and make for the eastern channel, the captain increased to full power and used rudder movements. But the tow contacted the center bridge pier, breaking up the tow, sinking one barge and damaging two others. The captain acknowledged that he was lulled by his own long experience. Full report: https://www.ntsb.gov/investigations/AccidentReports/Reports/MIR2406.pdf

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data