SHENG HENG HAI
Course/Position
Latest ports
Latest Waypoints
Latest news
Grounding on Paraná
On May 18, 2021, the 'Sheng Heng Hai', while enroute from Aroyo Seco to Puta del Esta, ran aground on the Paraná River at kilometer 316 sailing downriver with a draft of 9,47 meters. Around 4 a.m. the vessel was refloated by her own means. The Coast Guard instructed the captain to proceed to an anchorage at Ramallo roads in order to perform inspections and formalities. Until the bathymetry has been performed and fulfilled by the Coast Guard, the maximum sailing draft for navigating the main channel was 8,50 meters.
Upload News