General information

IMO:
9242340
MMSI:
538001923
Callsign:
V7FF3
Width:
21.0 m
Length:
139.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Other Ship
Ship type:
Flag:
Marshall Islands
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
117.0° / -2.0
Heading:
198.0° / -2.0
Speed:
Max speed:
Status:
moored
Location:
Lautoka (Port Terminals Limited Lautoka)
Area:
Fiji
Last seen:
2025-02-08
2 min ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
5 min ago
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2025-02-06
1d 23h 25m
2024-12-07
2024-12-09
2d 13h 8m
2024-12-05
2024-12-05
9h 16m
2024-12-02
2024-12-05
2d 2h 7m
2024-10-15
2024-11-16
31d 17h 29m
2024-09-07
2024-09-09
2d 16h 28m
2024-07-30
2024-08-01
1d 17h 9m
2024-07-23
2024-07-28
4d 16h 44m
2024-06-08
2024-06-13
5d 9h 32m
2024-05-21
2024-05-22
1d 16h 51m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Kukup Island
2024-03-12
Leave
Kukup Island
2024-03-07
Enter
Kukup Island
2024-02-10
Leave
Malacca Straits - Port Klang
2024-02-10
Leave
Malacca Straits - Penang Island
2024-02-10
Leave
Malacca Straits - Port Klang
2024-01-30
Enter
Malacca Straits - Penang Island
2024-01-30
Enter
Note: All times are in UTC

Latest news

Scilly’s New Broadband Cable Comes Ashore Today

Wed Jul 23 11:06:14 CEST 2014 arnekiel

The cable that will bring superfast broadband to Scilly is being brought ashore today. A fibre optic cable that linked the UK to Santander in Spain, and which has been redundant for eight years, has been reused. The estimated £3.7m cost of the work is being financed by the EU and BT as part of the £132m Superfast Cornwall Initiative. Over the last week, the cable ship CS Resolute has cut the cable to the south of the islands and redirected a section to St Mary’s. This lunchtime, the cable will be brought ashore with help from the Harbourmaster’s boat Pegasus. When switched on later this year, the connection will bring faster internet access than is currently available using our microwave link to Cornwall. All net users should notice much faster downloads of up to 80Mbps and less downtime.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data