General information

IMO:
9117337
MMSI:
232002589
Callsign:
MVRW8
Width:
18.0 m
Length:
93.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Passenger ship
Ship type:
Flag:
United Kingdom
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
22.4° / 0.0
Heading:
205.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Southampton (Isle of Wight Ferry Terminal)
Area:
West Europe
Last seen:
2024-07-05
1 min ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
3 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-07-05
9m
2024-07-05
2024-07-05
42m
2024-07-05
2024-07-05
40m
2024-07-05
2024-07-05
41m
2024-07-05
2024-07-05
38m
2024-07-05
2024-07-05
39m
2024-07-05
2024-07-05
42m
2024-07-05
2024-07-05
37m
2024-07-05
2024-07-05
3h 37m
2024-07-04
2024-07-05
38m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Southampton Approach
2024-07-05
Leave
Fawley Approach
2024-07-05
Leave
Fawley Approach
2024-07-05
Enter
Southampton Approach
2024-07-05
Enter
Southampton Approach
2024-07-05
Leave
Fawley Approach
2024-07-05
Leave
Fawley Approach
2024-07-05
Enter
Note: All times are in UTC

Latest news

Ferry suffered technical issue

Mon Jun 24 10:08:13 CEST 2024 Timsen

On June 23, 2024, the 'Red Eagle' suffered a technical issue on the aft engine. As a consequence, the scheduled crossing from Southampton to East Cowes at 1.p.m. and the departure from East Cowes at 2.30 p.m. were cancelled as well as the sailing at 4 p.m. from Southampton and atr 5.30 p.m. from East Cowes. The ship finally resumed its schedule at 9.15 p.m.

Two Wightlink ferries troubled

Sun Mar 17 18:52:07 CET 2024 Timsen

The CEO of Red Funnel Ferries has apologised for the disruption and delays on the weekend of March 15/16, 2024, which brought misery to hundreds of people travelling between Southampton and Cows upon the the Isle of Wight The 'Red Jet 7' had suspended its passenger service on March 16 because of technical problems in the propulsion system. A technical team was working to resolve the issue. Red Jet will be offering a replacement service from March 17, which will take 50 minutes rather than the Red Jet's 28 minutes crossing. An issue with a fuel leak on the 'Red Eagle' meant the ferry was also out of commission for a time, causing major delays and crowded crossings because of the backlog.

Ferry suffered technical issue

Mon Feb 05 21:37:00 CET 2024 Timsen

The 'Red Eagle', while serving between East Cowes and Southampton, suffered a technical issue with the Voith propulsion on Jan 30, 2024. Subsequently, the 4.30 p.m. and 7.30 p.m. crossings from Southampton and the 6 p.m. and 9 p.m. sailings from East Cowes were cancelled with the ferry service operating with reduced sailings this afternoon and evening.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data