General information

IMO:
9637868
MMSI:
577087000
Callsign:
YJSA9
Width:
83.0 m
Length:
77.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Other Ship
Ship type:
Flag:
Vanuatu
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
336.8° / -128.0
Heading:
511.0° / -128.0
Speed:
Max speed:
Status:
moored
Location:
Rotterdam (Wiltonhaven)
Area:
Netherlands
Last seen:
2024-07-08
4 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
7 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-06-06
31d 14h 55m
2024-05-27
2024-06-02
5d 18h 51m
2020-05-16
2020-10-05
141d 11h 2m
2019-10-01
2019-11-13
43d 18h 25m
2018-08-12
2018-12-25
134d 20h 12m
2017-12-04
2018-02-10
67d 18h 39m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Dirkzwager Maassluis
2024-06-06
Leave
Hook of Holland
2024-06-06
Enter
Den Helder
2024-06-06
Leave
Terschelling
2024-06-05
Enter
Terschelling
2024-06-03
Leave
Den Helder
2024-06-03
Enter
Den Helder
2022-02-27
Enter
Note: All times are in UTC

Latest news

Greenpeace entered drilling platform near Borkum

Wed Jun 05 08:52:13 CEST 2024 Timsen

The highest Dutch court has issued a temporary halt to construction on a gas well near Borkum on June 4, 2024. Greenpeace had previously protested on the drilling platform. The German Environmental Aid (DUH) , along with other partner organizations, had submitted an urgent application against the planned drilling. The court followed this. A final decision will be made next week after a hearing. The DUH accuses the energy company One-Dyas and the Dutch Ministry of Economic Affairs and Climate Protection of circumventing a previous court-ordered halt to construction by amending the permit. The Dutch Ministry of Economic Affairs cleared the way for the controversial project on on May 29 after One-Dyas had made adjustments to the environmental requirements for the construction work in accordance with a previous court order. The 'Prospector 1' was brought by One-Dyas to the planned extraction site northwest of Borkum on the night of June 3 to start preparatory work for natural gas extraction. Greenpeace members protested against this on the morning of Juen 4. Some activists secured themselves to a platform and prevented the preparatory work from starting. One-Dyas reacted with incomprehension to the action, but assured that it would do everything to ensure the safety of the activists and the crew. One-Dyas announced last week that it was sticking to the goal of producing the first natural gas this year. Reports with photos and video: https://www.greenpeace.de/klimaschutz/energiewende/gasausstieg/kein-neues-gas https://www.ndr.de/nachrichten/niedersachsen/oldenburg_ostfriesland/Gasbohrungen-vor-Borkum-Gericht-erlaesst-vorlaeufigen-Baustopp,bohrplattform102.html

Allision in Ijmuiden

Sun Dec 16 17:17:42 CET 2018 Timsen

On Dec 7, 2017, the reefer "Scombrus" was in allision with the "Prospector I" which was berthed in the Haringhaven in the port of Ijmuiden. The reefer suffered damage of the hull at starboardside amidships and berthed at the cutter quay at 7.40 p.m. where it remained under repair since. No reports on damages on the drill vessel. Photos: http://www.shipspotting.com/gallery/photo.php?lid=2945895 http://www.shipspotting.com/gallery/photo.php?lid=2945893 http://www.shipspotting.com/gallery/photo.php?lid=2945896

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data