General information

IMO:
7916997
MMSI:
667001710
Callsign:
9LU2513
Width:
16.0 m
Length:
107.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Sierra Leone
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Anchored
Course:
360.0° / 0.0
Heading:
50.0° / 0.0
Speed:
Max speed:
Status:
anchorage
Area:
Mediterranean Sea
Last seen:
2024-08-06
1 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
3 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-07-27
2024-07-27
27m
2024-07-06
2024-07-10
3d 11h 44m
2024-07-04
2024-07-06
2d 9m
2024-06-18
2024-06-19
1d 13h 1m
2024-06-11
2024-06-14
3d 9m
2024-05-21
2024-05-25
3d 18h 55m
2024-05-16
2024-05-16
4h 11m
2024-05-08
2024-05-08
6h 52m
2024-04-17
2024-05-05
17d 11h 5m
2024-04-04
2024-04-05
16h 27m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Marmara Island
2024-07-27
Enter
Bosphorus Bridge 1
2024-07-27
Enter
Bosphorus Bridge 2
2024-07-27
Enter
Bosphorus Bridge 2
2024-07-10
Leave
Bosphorus Bridge 1
2024-07-10
Leave
Marmara Island
2024-07-04
Leave
Bosphorus Bridge 1
2024-05-08
Enter
Note: All times are in UTC

Latest news

Engine failure in Dardanelles

Mon Jul 04 09:34:59 CEST 2016 Timsen

The "Ibrahim Bey" suffered engine failure on July 3, 2016, around 11 a.m. in the Dardanelles, while proceeding in northern direction after having from Izmir to Galati on July 2. The master reported the damage to the Turkish Department of Vessel Traffic Services (VTS). The bulkcarrier was taken to the Nara Burnu anchorage north of Canakkale to rectify the problem, ETA at Galati being July 6.

Bulkcarrier disabled in Mediterranean Sea

Thu May 07 09:32:18 CEST 2015 Timsen

The "Ibrahim Bey" was disabled on May 6, 2015, at 1 p.m. in position 36 25N 028 20E, southeast of Rhodes. The vessel was enroute from Damietta to Istanbul. In the run of May 5 she was anchored on Rhodes roads and then proceeded in southeastern direction.

Grounding off Venice

Thu Feb 19 10:38:34 CET 2015 Timsen

The "Ibrahim Bey" ran aground at the entrance of Choiggia port in the Venice area on Feb 9, 2015, while leaving the port. Several attempts to refloat vessel with the help of tugs failed. At 5 a.m. UTC on Feb 11 the vessel was still aground. It sailed from Venice Commercial Terminals on Feb 16 around 5 p.m., bound to Tenes, ETA Feb 23.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data