POM
Course/Position
Latest ports
Latest Waypoints
Latest news
Detention in Pozzallo
The 'Pon' was detained on April 29, 2025, in Pozzallo with 19 deficiencies, nine of which being regarded as seriously and grounds for a detention: 1) Structural conditions - Asbestos containing materials Not properly maintained 2) Fire safety - Fire doors/openings in fire resisting divisions Not as required 3) Fire safety - Division - decks, bulkheads and penetrations Not as required 4) Fire safety - Fire prevention structural integrity Not as required 5) Emergency system - Emergency lighting, batteries and switches Inoperative 6) Emergency system - Fire drills Lack of training 7) Water/Weathertight - Ventilators, air pipes and casings Not as required 8)) Labour conditions - Provisions quantity Insufficient 9) Labour conditions - Water, pipes and tanks Damaged The vessel was released again on May 16 and permitted a single voyage to the Tuzla shipyard area for permanent repairs with an ETA as of May 20. https://www.facebook.com/profile.php?id=100063576908591
POM 9127980
After the grounding of the “Irtysh 1” on Feb 8, 2010, in the Bourgas Bay near Kraimorie, Multraship Salvage and SVITZER were instructed to refloat the ship after salvage attempts of the owner remained unsuccessful. 4 tugs of Multraship from Bourgas were mobilized as well as a salvage team of SVITZER and pulled the „Irtysh“ of the ground 10 days after the grounding. It was berthed in Bourgas for inspections
Upload News