General information

IMO:
9208198
MMSI:
257113350
Callsign:
LAKT8
Width:
22.0 m
Length:
143.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Norway
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
173.0° / 0.0
Heading:
45.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Tekirdag (Tekirdag Port)
Area:
Sea of Marmara
Last seen:
2024-07-03
2 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
3 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-07-02
8h 28m
2024-07-02
2024-07-02
4m
2024-06-29
2024-07-02
3d 2h 27m
2024-06-26
2024-06-28
2d 5h 5m
2024-06-09
2024-06-10
1d 19h 3m
2024-06-02
2024-06-08
5d 14h 56m
2024-05-30
2024-05-31
21h 18m
2024-05-16
2024-05-18
1d 20h 58m
2024-05-12
2024-05-15
2d 22h 24m
2024-05-08
2024-05-09
10h 12m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Marmara Island
2024-06-25
Leave
Pantelleria East
2024-06-22
Enter
Sizilien
2024-06-22
Enter
El-Jazair
2024-06-21
Leave
Isla de Alboran
2024-06-20
Enter
Strait of Gibraltar
2024-06-20
Leave
Dover
2024-06-16
Enter
Note: All times are in UTC

Latest news

Main engine problem off Rame Head

Fri Feb 24 10:08:00 CET 2023 Timsen

The 'Oslo Wave 3', en route from Hamina to Bejaia with 13 crew members and 11400 metric tonnes of timber as cargo on board, suffered a problem with the thermal oil in the main engine in pos. 49 37 00 N, 004 03 01 W, 44,2 nautical miles off Rame Head on Feb 22, 2023, at around 10 a.m. UTC. At 12.40 p.m. the defect had been repaired, and the vessel continued the voyage with an ETA as of Feb 27.

Cargo ship suffered pump damage

Fri Mar 01 10:49:18 CET 2019 Timsen

The "Oslo Wave 3", en route from Oulu to Alexandria suffered a crack in its lube oil pipe in the engine room in position 51 13 06 N, 001 44 03 E on Feb 28, 2019, at 2.10 a.m. The vessel was disabled due to the subsequent lack of engine power. The crew conducted repair works which were completed by 07.45 a.m., and the ship resumed its voyage, ETA March 11.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data