General information

IMO:
9008586
MMSI:
312591000
Callsign:
V3MT4
Width:
33.0 m
Length:
177.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Belize
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
207.3° / 0.0
Heading:
301.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Aliaga (Cukurova Pier)
Area:
Mediterranean Sea
Last seen:
2025-03-12
14 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
1 hour ago
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2025-03-07
4d 17h 51m
2025-02-19
2025-02-21
2d 6h 34m
2025-02-17
2025-02-17
7h 44m
2025-02-15
2025-02-15
5h 46m
2025-02-14
2025-02-15
13h 20m
2025-02-05
2025-02-07
1d 18h 50m
2025-01-29
2025-01-31
1d 11h 41m
2025-01-23
2025-01-24
1d 2h 37m
2025-01-05
2025-01-08
2d 20h 2m
2024-12-29
2025-01-01
3d 3h 34m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Pantelleria East
2025-01-21
Enter
Pantelleria East
2024-11-17
Enter
Sizilien
2024-11-15
Leave
Pantelleria East
2024-11-13
Leave
Pantelleria East
2024-11-06
Enter
Pantelleria West
2024-11-03
Enter
Pantelleria East
2024-08-01
Enter
Note: All times are in UTC

Latest news

Detention in Kocaeli

Sat Feb 22 18:02:50 CET 2025 Timsen

On Feb 17, 2025, the 'NS Helse' was detained in Kocaeli with nine deficiencies , eight of which being regarded as seriously and grounds for a detention: 1) Life saving Appliances - Rescue boats Inoperative 2) Life saving Appliances - Embarkation arrangements rescue boats Inoperative 3) Structural conditions - Beams, frames, floors - construction Not as required 4) Structural conditions - Ballast, fuel and other tanks Holed 5) Structural conditions - Other (Structural conditions) Other 6) Living and working - Cleanliness of engine room Insufficient 7) Living and working - Ventilation (Working spaces) Not as required 8)) Fire safety - Fire doors/openings in fire resisting division - Malfunctioning The vessel was released again on Feb 18 and was permitted a single voyage to Altinova for permanent repairs, where it remained from Feb 19-21 before proceeding to Icdas with an ETA as of Feb 22. https://www.facebook.com/profile.php?id=100063576908591

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data