General information

IMO:
9750660
MMSI:
477327300
Callsign:
VRRY3
Width:
50.0 m
Length:
299.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Tankship
Ship type:
Flag:
Hong Kong
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
45.3° / 8.0
Heading:
47.0° / 8.0
Speed:
Max speed:
Status:
moving
Area:
Norwegian Sea
Last seen:
2025-04-18
2 days ago
 
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
2 days ago 
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2025-04-14
2025-04-15
1d 3h 34m
2025-02-15
2025-02-16
1d 1h 29m
2024-12-23
2024-12-25
1d 18h 8m
2024-11-02
2024-11-03
1d 6h 35m
2024-10-17
2024-10-18
1d 4h 5m
2024-09-30
2024-10-01
1d 2h 9m
2024-09-07
2024-09-08
1d 42m
2024-07-22
2024-08-13
21d 23h
2024-07-16
2024-07-17
1d 1h 38m
2024-06-12
2024-06-13
1d 5h 19m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Calais
2025-04-15
Leave
Calais
2025-04-15
Enter
St. Georges Channel
2025-02-17
Leave
St. Georges Channel
2025-02-13
Enter
Zeebrugge Breakwaters
2024-12-25
Leave
Zeebrugge Breakwaters
2024-12-23
Enter
Note: All times are in UTC

Latest news

Russia conducted double STS-LNG Transfer to circumvent EU sanctions

Tue Apr 01 10:26:04 CEST 2025 Timsen

Just days after the EU banned the transshipment of Russian LNG, Russia deployed four LNG tankers, the 'Nikolay Urvantsev' and the 'Vladimir Rusanov' (IMO: 9750701), both controlled by the Mitsui O.S.K. Lines Ltd, which rendezvoused with the 'Lena River' (IMO: 9629598) and 'Clean Vision' (IMO: 9655456) for an unusual double ship-to-ship transfer at the Kildin anchorage near Murmansk. The vessels were carrying supercooled gas from the Yamal LNG project operated by Russian company Novatek. The four vesselswere pairing up just south of Kildin island between March 28 and March 31, 2025. An STS transfer routinely takes around 36-48 hours. The 'Lena River' had departed from China at the end of 2024. The vessel subsequently idled for weeks in the North, Celtic and Barents Seas. The 'Clean Vision' had left from Mirs Bay near Shenzhen on Feb 21. The 'Nikolay Urvantsev' and 'Vladimir Rusanov' both had sailed from the Yamal LNG plant around a week ago.

MOL Names 3rd Yamal LNG Carrier

Sun Jul 21 13:31:54 CEST 2019 arnekiel

Japanese logistics major Mitsui O.S.K. Lines (MOL) announced that a naming ceremony for an ice-breaking LNG carrier, jointly ordered by MOL and China COSCO Shipping Corporation Limited (China COSCO Shipping), was held at Daewoo Shipbuilding & Marine Engineering Co., Ltd. (DSME). The newbuilding has been named Nikolay Urvantsev, in honor of the famous Russian Arctic explorer and geologist. A crowd of VIPs, including personnel from PAO Novatek, the main shareholder of the Yamal LNG project participated in the ceremony. A press release from MOL said that the "Nikolay Urvantsev" is the sister vessel of the "Vladimir Rusanov" and "Vladimir Vize", which started transport service in 2018 under a long-term charter contract to transport LNG for the YAMAL LNG Project.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data