LOCHNEVIS
Course/Position
Latest ports
Latest Waypoints
Latest news
Ferry suffered technical issue
The 'Lochnevis', serving on the route Mallaig-Armadale, suffered a technical issue on the morning of Feb 3, which required further investigation. As a result, the scheduled arrival in Armadale at 09:10 a.m. was delayed by approximately 20 minutes. As a result, this may have a knock on effect to the 09:25 am departure from Armadale to Mallaig.
Ferry suffered technical issue
The 'Lochnevis', serving on the route Ardmhor (Barra) - Eriskay suffered a technical issue on Jan 13 in Ardmhor. As a consequence, the scheduled sailing at 09:15 a.m. from Ardmhor and the departure att 10:10 a.m.from Eriskay had to be cancelled. After the issue was resolved, the ferry resumed its service with the 11:10 a.m. sailing departing Ardmhor.
Ferry drydocked for engine repairs
The 'Lochnevis', serving on the route Mallaig-Armadale, has been removed from service and entered dry dock of the Dales Marine Service in Troon on Dec 14 to resolve the technical issue affecting the port side main engine. The ferry boat 'Julie-Ann' was inserted to operatea passenger-only charter until further notice and until Jan 10, 2025, at least. On Jan 9 and Jan 10 it was operating according to the following schedule: https://www.calmac.co.uk/en-gb/service-status/#/service-status/033?route=18
Upload News