LOCH ALAINN
Course/Position
Latest ports
Latest Waypoints
Latest news
Ferry suffered issue with blocked pipe
The ''Loch Alainn', serving on the route Barra-Eriskay, suffered an issue with a suspected blocked pipe on Sep 3. As a consquence, initially all sailings were liable to disruption or cancellation at short notice. After the issue with the blocked pipe was resolved, the service was operated according to schedule.
Sailings cancelled due to repair
As the 'Loch Alainn', serving on the route Ardmhor-Eriskay, was carrying out a repair on Aug 27 and to provide crew compensatory rest, the 07:00 a.m. request sailing departing Barra and the 08:10 a.m. request sailing departing Eriskay have been cancelled.
Sailings cancelled due to technical issue
The 'Loch Alainn', serving on the route Barra - Eriskay, suffered a Technical issue with the toilet on April 8. As a consequence, the scheduled departure from Barra at 3:45 p.m. and from Eriskay at 4:35 p.m. had to be cancelled. After the technical issue has been suceessfully resolved, the vessel will operate the additional sailings from Barra at 7:15 p.m. with an arrival at Eriskay at 7:55 p.m. and from Eriskay at 8:00 p.m., arriving at Barra at 8:40 p.m.
Upload News