HULK
Course/Position
Latest ports
Latest Waypoints
Latest news
Tug suffered electrical problem
The 'Hulk', while heading south en route from Kiel, was forced to divert to Brest on June 4 following an electrical problem caused by a faulty transformer, as well as problems with its compass. The ship was moored at the eastern quay of the fifth dock of the commercial port on June 5 in order to undergo repairs there for two days. Report with photo: https://www.letelegramme.fr/finistere/brest-29200/port-de-commerce/a-brest-de-petites-reparations-seront-effectuees-sur-le-remorqueur-hulk-avant-le-golfe-de-gascogne-6830754.php
Tugs sold by SFK Kiel
Just a few days after the tugs "Bülk" and "Kitzeberg" were put up for sale, there were interested buyers from abroad. The "Bülk" has already left Kiel and has berthed at a shipyard in Assens on May 5, 2025. The buyer is the shipping company Oceanteam from Trieste. They have already renamed the tug "Hulk." Many of their approximately 50 tugs were built or operated in Germany before. The shipping company operates in northern Italy, Slovenia, and Montenegro. The "Kitzeberg" found a potential buyer from Tanzania who are plannign to operate the tug in West Africa under the name "Kitzeberg." The buyer was awarded the contract on May 19.
Bülk being surveyed at Lindenau Yard after accident
The "Bülk" will be out of service for some weeks after a piece of the attachment of the cable was thrown with considerable force into the wheelhouse. The starboard side of the command device and the helm was completely destroyed in the accident. The tug is now assessed at the Lindenau Shipyard in Kiel-Friedrichsort. The Water Police also imposed the ship until the case is fully investigated.
Upload News