General information

IMO:
8503797
MMSI:
247435800
Callsign:
IBDC
Width:
26.0 m
Length:
180.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Passenger ship
Ship type:
Flag:
Italy
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
142.8° / -127.0
Heading:
137.0° / -127.0
Speed:
Max speed:
Status:
moving
Area:
Tyrrhenian Sea
Last seen:
2024-07-08
1 min ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
2 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-07-07
2024-07-07
7h 7m
2024-07-06
2024-07-07
18h 48m
2024-07-05
2024-07-05
13h 21m
2024-07-04
2024-07-04
12h 41m
2024-07-03
2024-07-03
6h 35m
2024-07-03
2024-07-03
2h 59m
2024-07-02
2024-07-02
13h
2024-07-01
2024-07-01
12h 41m
2024-06-30
2024-06-30
12h 29m
2024-06-29
2024-06-29
13h 1m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Strait of Messina
2024-06-21
Leave
Strait of Messina
2024-06-10
Enter
Strait of Messina
2023-03-15
Leave
Strait of Messina
2022-12-04
Enter
Isla de Alboran
2021-04-28
Enter
Strait of Gibraltar
2021-04-27
Leave
Dover
2021-04-23
Enter
Note: All times are in UTC

Latest news

Experienced cooling system failure

Thu Jul 04 11:08:05 CEST 2019 arnekiel

Passenger ro/ro Pride of Bruges (31598 gt, built 1987), en route from Zeebrugge to Hull, United Kingdom, experienced cooling system failure, which further caused engine problems and restricted manoeuvrability, in position lat 52 53 52.1N, long 001 37 51.2E, at 0052 hrs, today. Subsequently, the problem was rectified, and the vessel was under way, at 0159 hrs, UTC, today.

Technical trouble knocked out ferry

Fri May 12 11:35:53 CEST 2017 Timsen

The "Pride of Bruges" has been struck down by a technical engineering issue and limped into Kingston-upon-Hull several hours late on May 10, 2017, at 8.40 a.m. coming from Zeebrugge. The return sailing at 6.30 p.m. was cancelled. The ship made one more sailing at 9.30 p.m., arriving in eebrugge on May 11 at 1.20 p.m. and heading for Rotterdam at 8 p.m. The ship entered the Keppel Verolme Shipyard in Rotterdam on May 12 at 7 a.m. Passengers were now facing major disruptions as the ferry was expected be out of action until June 5, leaving only the "Pride of York" on the route. P & O chartered the freight m/v "Autobay" for the duration of repairs and she joined the route today with her first voyage to Zeebrugge on May 12.

P&O Ferries’ refurbished Zeebrugge-Hull ferry Prides of Bruges back in service

Tue Mar 21 19:10:13 CET 2017 arnekiel

Zeebrugge-Hull sisters PRIDE OF YORK and PRIDE OF BRUGES have now completed their GBP 8.5m refit at Remontowa. Prides of Bruges back in service at Zeebrügge on March 21, 2017 https://www.shippax.com/en/news/po-ferries-refurbished-zeebrugge-hull-pair-back-in-service.aspx

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data