General information

IMO:
9762261
MMSI:
538010102
Callsign:
V7A5602
Width:
46.0 m
Length:
295.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Tankship
Ship type:
Flag:
Marshall Islands
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
216.4° / 0.0
Heading:
46.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Freeport TX (Freeport- LNG Terminal)
Area:
United States
Last seen:
2025-06-16
3 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
6 min ago
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2025-06-15
1d 2h 43m
2025-05-29
2025-05-29
23h 5m
2025-04-28
2025-04-29
23h 53m
2025-04-05
2025-04-06
22h 37m
2025-02-13
2025-02-14
1d 9h 3m
2025-02-13
2025-02-13
18m
2025-01-25
2025-01-26
23h 8m
2025-01-19
2025-01-22
3d 11h 54m
2024-12-13
2024-12-24
11d 2h 16m
2024-12-10
2024-12-11
1d 5m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Dover
2025-05-30
Enter
Calais
2025-05-30
Enter
Zeebrugge Breakwaters
2025-05-29
Leave
Zeebrugge Breakwaters
2025-05-28
Enter
Calais
2025-05-28
Leave
Note: All times are in UTC

Latest news

Sold

Thu May 09 19:02:43 CEST 2019 arnekiel

sold for $ 210m to Korean Hyundai Glovis - T/C back

FLEX LNG Sings TC for First LNGC Newbuilding

Fri Dec 29 10:58:24 CET 2017 arnekiel

FLEX LNG announced that it has entered into a time-charter contract for the LNG carrier newbuilding, Flex Endeavour, to Uniper Global Commodities, a leading international energy company with operations in more than 40 countries, and headquarter in Germany. Flex Endeavour is a state-of-the-art 173,400 m3 cargo capacity LNG carrier equipped with the new high efficiency MEGI propulsion system. The Vessel is currently under construction at DSME, South Korea. The time charter period is for 15 to 18 months commencing immediately upon the delivery from the shipyard in January 2018. This charter formalizes the arrangement that was agreed for the extension of the chartered-in vessel from April 2018. This arrangement brings forward the delivery date to coincide with the delivery of the Vessel in H1 January 2018. https://www.marinelink.com/news/newbuilding-sings-first432494

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data