General information

IMO:
MMSI:
367011820
Callsign:
WDF5817
Width:
11.0 m
Length:
36.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Other Ship
Ship type:
Flag:
United States of America
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Undefined
Course:
179.0° / 0.0
Heading:
183.0° / 0.0
Speed:
Max speed:
Status:
moving
Area:
United States
Last seen:
2023-05-10
539 days ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
539 days ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2023-05-08
2023-05-08
8h 34m
2023-05-05
2023-05-05
1h 56m
2023-05-04
2023-05-04
1h
2023-05-02
2023-05-02
1h 39m
2023-04-27
2023-04-28
17h 34m
2023-04-26
2023-04-27
9h 42m
2023-04-23
2023-04-23
33m
2023-04-20
2023-04-20
5h 18m
2023-04-16
2023-04-17
14h 50m
2023-04-14
2023-04-15
7h 9m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
-
-
-

Latest news

Barge scraped bridge

Mon Dec 14 11:13:32 CET 2015 Timsen

The Lake Barkley Bridge in Trigg County was struck by a barge in the evening of Dec 13, 2015. At 6:45 p.m., the Coast Guard received a report from the"Jinx P. Smith" that it had scraped the left descending pier on the bridge causing a dent in the port lead barge. The tow boat was pushing four empty fertilizer barges at that time. Due to the minor nature of the scrape the Coast Guard did not ask that the bridge be closed to traffic. However, once an inspector arrives on site around 8:30 p.m., the bridge was closed for about 20 to 30 minutes to allow access to the deck so a safety check can be run on the bridge structure. Provided no damage is found, the bridge will immediately reopen to normal traffic flow.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data