CR TETHYS
Latest ports
Latest Waypoints
Latest news
Detention in Tauzhou
The "CR Tethys" was detained in Tauzhou, Jiangsu, on May 23, 2025, with eight deficiencies, three of which being regarded a seriously and grounds for a detention: 1) Dangeroos goods - Tmeperature control Not as required 2) Pollution Prevention - Ballast Water Management System Not as required 3) Radio communications - Reservce source of energy Not as required The vessel was released again on May 24. The last detention was on Jan 2, 2025, in Kandla with 19 deficiencies for five days. https://www.facebook.com/profile.php?id=100063576908591
Tanker detained in Kandla
On Dec 26 , 2024, the 'CR Tethys' was detained in Kandla with 13 deficiencies: 1) Life saving Appliances - Launching arrangements for rescue boats Inoperative 2) Safety of navigation - Radar Not as required 3) Safety of navigation - Safe means of access Not as required 4) Safety of navigation - Electrical in general Not as required 5) Safety of navigation - Other (Safety in general) Other 6) Water/Weathertight - Ventilation, air pipes and casings Not as required 7) Propulsion and auxiliary machinery - Propulsion main engine Not as required 8)) Propulsion and auxiliary machinery - Auxiliary machinery Not as required' 9) Pollution Prevention - Sewage treatment plant Not as required 10) Emergency systems - Emergency fire pumps and its pipes Inoperative 11) Structural conditions - Hull - Corrosion Corroded The vessel was released again on Jan 2, 2025, and remained anchored off Kandla as of Jan 13 in pos. 22° 49' N 070° 08' E. https://www.facebook.com/profile.php?id=100063576908591
Upload News