General information

IMO:
9190171
MMSI:
275511000
Callsign:
YLRB
Width:
12.0 m
Length:
89.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Latvia
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
277.0° / 0.0
Heading:
268.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Gdynia (Gdynia Shipyard)
Area:
Poland
Last seen:
2024-07-05
3 min ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
5 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-05-19
47d 3h 5m
2024-05-11
2024-05-14
3d 15h 50m
2024-05-08
2024-05-08
50m
2024-05-08
2024-05-08
47m
2024-05-07
2024-05-08
22h 1m
2024-05-05
2024-05-06
1d 1h 20m
2024-05-03
2024-05-04
17h 37m
2024-05-01
2024-05-03
1d 16h 50m
2024-04-27
2024-04-30
3d 22h 23m
2024-04-24
2024-04-25
1d 10h 44m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Gulf of Gdansk
2024-05-19
Enter
Oresund Bridge
2024-05-17
Enter
Landskrona
2024-05-17
Enter
Helsingborg
2024-05-17
Enter
Anholt
2024-05-17
Enter
Läsö DK
2024-05-17
Enter
Skagen
2024-05-17
Enter
Note: All times are in UTC

Latest news

Ship stopped by emergency anchoring

Thu May 29 13:15:44 CEST 2014 Timsen

On May 28, 2014 at 11:15 p.m. the "Capella" suffered engine failure on the Elbe between the buoys 90 and 92 at Pagensand. The ship had left the Norderyard in Hamburg after a stay of one week bound for Ghent at 9 p.m. Two hours later the pilot reported engine trouble via VHF. The police boat "WS 2 - Bürgermeister Weichmann" was dispatched to assist. At 11:30 p.m. the "Capella" had to be stopped by an emergency anchoring manoever in the northern fairway after the engine finally conked out. The "Bürgermeister Weichmann" secured the ship. It was found out that a lubricating oil pipe at the main engine had broken. The oil escaped under high pressure and splashed against the engine. This caused an increase of the temperature so that the main engine shut down. Short past midnight the engine was cleaned and the damage fixed so that it could be started again. At 00.45 a.m. the vessel was allowed to proceed and has an ETA at Ghent as of May 30, 10 a.m.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data