General information

IMO:
9433171
MMSI:
248437000
Callsign:
9HA2366
Width:
27.0 m
Length:
131.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Other Ship
Ship type:
Flag:
Malta
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Restricted movement
Course:
159.9° / 5.0
Heading:
214.0° / 5.0
Speed:
Max speed:
Status:
moored
Location:
Oso Offshore Terminal (Oso Offshore LPG)
Area:
Bight of Biafra
Last seen:
2025-03-14
13 hours ago
 
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
15 hours ago 
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2025-03-07
2025-03-15
7d 23h 32m
2025-03-05
2025-03-07
1d 17h 25m
2025-02-28
2025-03-01
21h
2025-02-26
2025-02-28
2d
2025-02-25
2025-02-26
1h 58m
2025-02-23
2025-02-25
2d 5h 34m
2025-02-19
2025-02-22
3d 11h 25m
2025-02-17
2025-02-18
16h 44m
2025-02-10
2025-02-14
4d 26m
2025-02-07
2025-02-10
3d 3h 38m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Bonny Approach
2025-01-09
Leave
Bonny Approach
2024-09-04
Leave
Bonny Approach
2024-07-17
Leave
Bonny Approach
2024-07-11
Enter
Bonny Approach
2024-07-02
Leave
Bonny Approach
2024-06-29
Leave
Bonny Approach
2024-06-22
Leave
Note: All times are in UTC

Latest news

Fugro lands Pyrenees contract offshore Australia

Fri Feb 05 10:55:36 CET 2016 arnekiel

Fugro has won a contract from Australia’s BHP Billiton Petroleum for work at the Pyrenees Phase 3 installation project offshore Western Australia. The installation project includes the tie back of the Stickle 9 well to the existing Tanglehead manifold, and Fugro’s scope of work includes suspension of existing infrastructure, and installation and pre-commissioning of the new flexibles and flying leads. ROV intervention and well commissioning support will be provided and the scope also includes the supply and fabrication of crossings, stabilisation and installation aids, along with mobilisation and transportation of equipment to the field. Fugro will utilise construction vessel Southern Ocean for the work, which will commence in May 2016. http://splash247.com/fugro-lands-pyrenees-contract-offshore-australia/

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data