General information

IMO:
9539858
MMSI:
248011000
Callsign:
9HA2125
Width:
17.0 m
Length:
109.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Tankship
Ship type:
Flag:
Malta
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
284.0° / 0.0
Heading:
290.0° / 0.0
Speed:
Max speed:
Status:
moving
Area:
Mediterranean Sea
Last seen:
2024-09-10
1 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
4 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-08-29
2024-08-30
20h 32m
2024-08-24
2024-08-27
2d 17h 58m
2024-08-21
2024-08-22
1d 14h 33m
2024-08-09
2024-08-10
1d 8h 47m
2024-08-07
2024-08-08
23h 13m
2024-08-05
2024-08-06
20h 36m
2024-08-05
2024-08-05
1h 36m
2024-08-03
2024-08-03
19h 41m
2024-07-30
2024-07-31
1d 13h 47m
2024-07-18
2024-07-19
20h 51m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Kreta
2024-09-08
Leave
Kreta
2024-08-19
Leave
Kreta
2024-07-24
Enter
Pantelleria East
2024-07-21
Enter
Sizilien
2024-07-21
Enter
Fos Approach
2024-07-19
Enter
Fos-sur-Mer
2024-07-19
Enter
Note: All times are in UTC

Latest news

Crew member went missing

Sun Oct 11 19:31:37 CEST 2020 Timsen

A crew member of the 'Athlos' went missing in the sea area of ​​Agiokampos, Larissa, on Oct 10, 2020. The JRCC was informed at noon by the captain of the ship which was 15 miles east of Agiokampos, Larissa, enroute from from Elefsina to Thessaloniki, unloaded. The Port Authorities of Thessaloniki, Volos, Skiathos, Nea Moudania, Platamona, Skala Katerini, Skopelos, Agiokampos Larissa, Agios Ioannis Mouresiou and Alonissos were informed and an SAR operation launched with negative results so far. The tanker moored in Thessaloniki on Oct 11.

Still at Tuzla shipyard

Mon Jul 08 10:19:20 CEST 2019 arnekiel

Combined chemical and oil tanker Athlos: Further repairs and maintenance are being carried out in the Tuzla shipyard. Vessel remains stationary in shipyard, as of July 7.

Repairs underway in Tuzla

Fri May 17 09:58:28 CEST 2019 Timsen

Steel renewals were being carried out in the cargo storage tank 5 in Tuzla aboard the fire damaged "Athlos". Air tightness tests and pumping system inspections will be conducted upon the completion of repairs. Termanent repairs were completed and the vessel given a new trading certificates on Aug 9. Permanent repairs were completed and the vessel given a new trading certificates on Aug 9. At 9.40 a.m. the ship sailed, bound to Port Said.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data