General information

Name:
Eastham
Country:
United Kingdom
UN/Locode:
GBEAM
Local time:
Moored Vessels:
5
Expected Vessels:
4
Berths:
6
Coordinates:
N 53° 19' W 002° 57'

Moored Vessels

Name
Type
Moored
Tanker
23.05. 23:08
Cargo Ship
19.05. 18:22
Tugboat
24.05. 13:00
Tugboat
24.05. 15:19

Expected Vessels

Name
Type
Expected
Tanker
26.05. 02:01
Tanker
26.05. 16:00
Tanker
27.05. 20:00
Tanker
28.05. 09:00

Sailed Vessels

Name
Type
Sailed
Cargo Ship
24.05. 12:24
Tanker
24.05. 11:40
Cargo Ship
24.05. 10:57
Tanker
24.05. 09:44
Tanker
24.05. 09:20
Tanker
23.05. 21:50
Tanker
23.05. 19:31
Tanker
23.05. 11:04
Tanker
23.05. 09:57
Tanker
22.05. 22:02

Latest news

Hydrodec to build UK's first oil re-refinery

Mon Aug 03 08:49:48 CEST 2015 arnekiel

Peel Ports Group on 31 July announced a deal worth GBP40 million (USD62.4 million) with the Hydrodec Group that will see the UK's first purpose-built oil re-refinery constructed on a nine-acre site at Port Wirral in Eastham. Hydrodec, which operates two other used oil re-refineries, in Ohio, US, and in New South Wales, Australia, expects to begin construction in 2016 and have the facility on stream in 18 months. It picked Port Wirral - which is being redeveloped - because of excellent transport connections by road, rail, and water, the latter via the River Mersey and Manchester Ship Canal. http://www.ihsmaritime360.com/article/18841/hydrodec-to-build-uk-s-first-oil-re-refinery

Upload News