Allgemeine Informationen

IMO:
MMSI:
244620946
Rufzeichen:
PC5205
Breite:
15.0 m
Länge:
40.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Other Ship
Ship type:
Flagge:
Netherlands
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moored
Kurs:
1.7° / 0.0
Kompasskurs:
48.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Rotterdam (Dintelhaven)
Gebiet:
Netherlands
Zuletzt empfangen::
2025-02-08
vor 1 Min
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 1 Min
Source:
T-AIS

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2025-02-08
7h 27m
2025-02-06
2025-02-06
3h 24m
2025-01-31
2025-02-04
3d 18h 9m
2025-01-31
2025-01-31
2h 6m
2025-01-29
2025-01-31
1d 12h 26m
2025-01-29
2025-01-29
6h 40m
2025-01-25
2025-01-27
1d 13h 53m
2025-01-21
2025-01-23
2d 13h 57m
2025-01-20
2025-01-20
24m
2025-01-19
2025-01-20
21h 2m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Hans Weert
2025-01-31
Ankommen
Terneuzen
2025-01-31
Abfahren
Terneuzen Locks approach
2025-01-31
Abfahren
TNZ Zeekanaallocks South
2025-01-29
Ankommen
TNZ Zeekanaallocks north
2025-01-29
Ankommen
Terneuzen Locks approach
2025-01-29
Ankommen
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Barge in danger of sinking after grounding

Fri Nov 21 18:27:18 CET 2014 Timsen

Salvors of Multraship refloated the grounded push combination "Veerhaven IX" in the east port of Terneuzen in the night hours of Nov 21, 2014. The combination with two loaded and two empty barges was en route from Vlissingen to Gent when around 2:15 a.m., just after high tide, the combination ran aground. The tug "Multratug 19" was quickly on the spot and could pull the combination in deep water in spite of the falling water. The convoy was taken to the East Haven, where an inspection by divers was conducted and it was found that one of the barges which was loaded with coal was taking in water. The salvors immediately mobilized a diving team, pumps, sealing materials and the crane "Ovet 8" to avoid a sinking. The leak was temporarily patched, the barge unloaded into an empty one and the salvage Operation finished at 1.30 p.m. The damaged barge was taken to the shipyard De Schroef in Sluiskil for repairs.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data