Allgemeine Informationen

IMO:
9728954
MMSI:
249808000
Rufzeichen:
9HA4385
Breite:
51.0 m
Länge:
369.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Cargo Ship
Ship type:
Flagge:
Malta
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
217.1° / 2.0
Kompasskurs:
220.0° / 2.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moving
Gebiet:
Laccadive Sea
Zuletzt empfangen::
2024-07-03
vor 2 Tagen
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 2 Tagen
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-07-02
2024-07-03
20h 27m
2024-06-26
2024-06-27
1d 46m
2024-06-20
2024-06-21
1d 4h 5m
2024-06-18
2024-06-18
9h 38m
2024-06-15
2024-06-16
1d 46m
2024-06-11
2024-06-12
1d 6h 9m
2024-06-05
2024-06-06
1d 9h 47m
2024-05-28
2024-05-28
18h 12m
2024-04-27
2024-05-01
3d 14h 44m
2024-04-23
2024-04-26
2d 12h 8m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Malacca Straits - Penang Island
2024-07-01
Ankommen
Malacca Straits - Port Klang
2024-06-27
Ankommen
Kukup Island
2024-06-27
Ankommen
Kukup Island
2024-05-28
Abfahren
Malacca Straits - Port Klang
2024-05-27
Abfahren
Malacca Straits - Penang Island
2024-05-26
Abfahren
Malacca Straits - North
2024-05-26
Ankommen
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Containership handled in just 36 hours after cargo damage

Thu Jun 14 13:52:32 CEST 2018 Timsen

The "Theseus", which had sustained damage in tropical storm Sagar in the Gulf of Aden, nearly 2.000 nautical miles from Sri Lanka, has been turned around in just 36 hours by Colombo International Container Terminals (CICT) when it arrived in the Port of Colombo. The "Theseus", operated under Ocean Alliance’s Asia-Mediterranean service by Evergreen Line, was en-route to Colombo on its weekly scheduled call after Jeddah, when the storm hit. Some of its containers were washed away while others were crushed, scattered around or left hanging along the stacks. On receipt of a distress call, the operations team from CICT boarded the vessel for a pre-inspection and developed a comprehensive action plan with a dedicated team of ship-to-shore gantry operators and experienced stevedores, after which vessel was brought alongside the CICT berth, by the pilots of the Sri Lanka Ports Authority (SLPA). The salvage operation commenced with an inspection of all damaged containers by a professional surveyor. Thereafter, the CICT team launched the simultaneous lashing and unlashing operation, which involved unlashing the damaged units, lashing adjacent containers to secure them and discharging the damaged units. After CICT’s operation which was completed in less than a day and a half, despite the harsh weather conditions, the "Theseus" was swiftly despatched to its next stop in Singapore where it arrived on May 27. Report with photos: https://www.themaritimestandard.com/cict-helps-stricken-containership/

Container loss in Indian Ocean

Mon Jun 04 09:17:38 CEST 2018 Timsen

The "Theseus" suffered a container collapse and loss in the Gulf of Aden, en route from Jeddah to Colombo, after being caught in the cyclone Sagar which ravaged the northwest Indian Ocean around May 19, 2018. The ship, operated under Ocean Alliance’s Asia-Mediterranean service by Evergreen Line, was en-route to Colombo on its weekly scheduled call after Jeddah. Some of the containers were washed away while others were crushed, scattered around or left hanging along the stacks. On receipt of a distress call, the operations team from CICT boarded the vessel for a pre-inspection and developed a comprehensive action plan with a dedicated team of ship-to-shore gantry operators and experienced stevedores, after which vessel was brought alongside the CICT berth, by the pilots of the Sri Lanka Ports Authority (SLPA). The salvage operation commenced with an inspection of all damaged containers by a professional surveyor. Thereafter, the CICT team launched the simultaneous lashing and unlashing operation, which involved unlashing the damaged units, lashing adjacent containers to secure them and discharging the damaged units after the ship had arrived at Colombo on May 22. After 36 hours, on May 24, it sailed again, bound to Singapore before proceeding to Qingdao, ETA June 4. Report with photos: http://www.thesundayleader.lk/2018/06/03/cict-salvages-storm-ravaged-mv-theseus-container-carrier/?utm_source=dlvr.it&utm_medium=facebook

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data