Allgemeine Informationen

IMO:
9232694
MMSI:
319234300
Rufzeichen:
ZGQN
Breite:
18.0 m
Länge:
98.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Other Ship
Ship type:
Flagge:
Cayman Islands
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
16.7° / 0.0
Kompasskurs:
14.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moving
Gebiet:
Mediterranean Sea
Zuletzt empfangen::
2024-09-14
vor 9 Std
 
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 18 Std 
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-03-21
2024-03-24
3d 3h 2m
2024-03-19
2024-03-20
1d 12m
2023-10-15
2024-03-18
155d 2h 26m
2022-11-19
2023-04-08
140d 11h 34m
2022-08-08
2022-08-13
4d 15h 17m
2022-08-04
2022-08-08
3d 22h 1m
2022-08-02
2022-08-04
1d 17h 16m
2022-07-04
2022-08-02
29d 13m
2022-05-25
2022-07-04
39d 18h 56m
2022-05-14
2022-05-25
11d 7h 36m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Port Said
2024-09-14
Abfahren
Suez
2024-09-14
Abfahren
Suez
2024-03-26
Ankommen
Port Said
2024-03-26
Ankommen
Port Said
2023-10-14
Abfahren
Suez
2023-10-14
Abfahren
Suez
2023-04-13
Ankommen
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Geosund investigating U 864 wreck

Wed Jan 08 10:21:51 CET 2014 Timsen

The Norwegigian Coastguard started investigating whether it was possible to get at the keel in the stern region of the German submarine wreck "U 864" on the sea bottom outside Fedje in Hordaland. The aim was to examine the condition of the cooling boxes and any mercury containers. The "Geosund " was used by DOF Subsea which was conducting the mission on behalf of the Coastguard. The "Geosund" reached the wreck position in the evening of Jan 7, 2014 ain order to deploy underwater sensors to monitor the spread of sediments. On Jan 8, the establishment of environmental monitoring of the operation was to be completed and efforts made to gain accesss to the keel region. This included the relocation of smaller wreckage and smaller amounts of sediment. The weather was challenging with wave heights up to four meters at the wreck position. An improvement was, however, anticipated. This is the final survey mission conducted in connection with the investigation of the options uplifting loads and subsequent cover-up of the wreck. The work will then be handed over the Ministry of External Quality Assurance in accordance with the National Model for Quality Assurance. Norwegian report with photo: http://www.kystverket.no/Nyheter/2014/Januar/Skal-undersoke-kjolen-pa-U-864/

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data