Allgemeine Informationen

IMO:
MMSI:
229065000
Rufzeichen:
9HA3040
Breite:
12.0 m
Länge:
136.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Passenger ship
Ship type:
Flagge:
Malta
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
132.6° / 0.0
Kompasskurs:
133.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moving
Gebiet:
Slovakia
Zuletzt empfangen::
2025-03-22
vor 46 Min
Source:
T-AIS
Von:
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 1 Std
Source:
T-AIS

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2025-03-21
2025-03-22
1d 14h 26m
2025-03-19
3d 17h 58m
2025-03-19
2025-03-19
9h 14m
2025-03-18
2025-03-18
7h 39m
2025-03-17
2025-03-17
11h 59m
2025-03-17
2025-03-17
21m
2025-03-16
2025-03-16
2h 55m
2025-03-15
2025-03-15
1h 29m
2025-03-15
2025-03-15
46m
2025-03-15
2025-03-15
21m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Schleuse Breisach Sued
2024-12-03
Abfahren
Weil Rhein Nord
2024-12-02
Abfahren
Weil Rhein Nord
2024-12-02
Ankommen
Schleuse Breisach Sued
2024-12-01
Ankommen
Nauw van Bath
2024-10-25
Ankommen
Antwerp
2024-10-25
Abfahren
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Allision in Berching

Mon Mar 17 10:08:45 CET 2025 Timsen

On the early morning March 15, 2025, the 'Scenyc Crystal', carrying 133 passengers and 56 crew members. allided with a road bridge near the Berching lock on the Main-Danube Canal, when entering the lock chamber en route to Nuremberg. The captain was steering the ship from the outside control station. He forgot to lower the wheelhouse. As a result, the roof hit the underside of the bridge. It was torn off and was pushed behind the wheelhouse. No one was inside the wheelhouse at the time of the accident, so only material dama occurred. The bridge remained undamaged. The captain reported the accident to the lock control center in Dietfurt and was able to safely berth in the upper water of the lock until an expert had assessed the functionality of the technic. The passengers 56 crew members remained on the ship for the time being. The passengers were then transported by bus to the next destination in Nuremberg. Shipping was disrupted for about two hours until the bridge and lock gate were inspected. The damage to the wheelhouse roof was estimated at around €200,000.

Cabin cruiser was too fast

Sat Sep 07 07:18:12 CEST 2013 Timsen

On Sep 6, 2013, at 07.10 Uhr a.m. the swell of the "Scenic Crystal" when leaving the south lock at Kostheim on the Main caused a movement of the tank barge "Vecht" by excessive Speed. Three of the four mooring ropes of the tank barge which was carrying 864 tons of caustic soda broke. A crew member was able to start the engine immediately and Keep the tanker from running onto a stone jetty.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data