Allgemeine Informationen

IMO:
9129471
MMSI:
370288000
Rufzeichen:
3FTD9
Breite:
18.0 m
Länge:
101.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Cargo Ship
Ship type:
Flagge:
Panama
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
20.1° / -128.0
Kompasskurs:
511.0° / -128.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moving
Gebiet:
Mediterranean Sea
Zuletzt empfangen::
2024-07-05
vor 3 Tagen
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 3 Tagen
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-06-21
2024-06-26
5d 4h 44m
2024-05-15
2024-05-18
2d 22h 27m
2024-05-07
2024-05-09
1d 14h 39m
2024-03-26
2024-04-13
18d 23h 38m
2024-03-19
2024-03-22
3d 2h 10m
2024-03-11
2024-03-12
1d 15h 11m
2024-02-22
2024-02-27
5d 5h 2m
2024-02-19
2024-02-20
16h 21m
2024-01-11
2024-01-13
2d 2h 33m
2023-12-04
2023-12-12
7d 17h 30m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Sizilien
2024-07-01
Abfahren
Pantelleria East
2024-07-01
Abfahren
Kreta
2024-06-29
Abfahren
Kreta
2024-06-04
Ankommen
Kreta
2024-05-11
Abfahren
Kreta
2024-04-16
Ankommen
Bosphorus Bridge 1
2024-03-11
Ankommen
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Report regarding Clonlee-grounding published

Wed Apr 04 21:34:44 CEST 2012 Timsen

The Marine Accident Investigation Branch has carried out a detailed probe into the grounding of the "Clonlee" on the river Tyne on Mar 16, 2011. An electrical fault caused her power to fail causing it to run aground. The ship was later able to free herself and continued the journey into the Port of Tyne. The 68-page report found that the most likely cause of the breakdown was electrical power failure in the confined waters of the harbour entrance. A number of human and machinery failures led to the vessel running aground. The two-man bridge team was ‘under-resourced’, and the vessel’s master was ‘cognitively overloaded and lost his situational awareness’, the report concludes. Significantly, the ship’s critical systems had not been operated, tested and maintained in accordance with the manufacturer’s instructions. And although the ship’s engineers were very experienced and held the required certificates of competency, they ‘demonstrated a limited knowledge of the ship’s electrical power supply, distribution and control systems. They were unable to recover the ship’s main power in a timely and controlled manner. The ship’s machinery had not been prepared for manoeuvring and deck crew were not standing by prior to entering the harbour.” Recommendations have been made to "Clonlee"’s owners, North Atlantic Shipping Limited, aimed at ‘addressing the atmosphere of complacency’ on its vessels. The company has been told to carry out a review of onboard training and take action to improve its crews’ emergency response procedures, and to ensure that all vessels are provided with manufacturer’s instruction manuals for all critical equipment and systems on board. Meanwhile, the Port of Tyne has changed its passage plan for vessels entering the harbour and issued a marine memo clarifying safety requirements. The report says: “The Port of Tyne has amended its port passage plan to include its seaward approaches, and has taken action to make amendments to its port users and ensure its Vessel Traffic Services operators closely monitor, and where necessary challenge, the intentions of vessels approaching the port in future.” The Port of Tyne has considered the observations made in the MAIB report and as a result have made some amendments to our Safety Management System.

SARA STAR 9129471

Thu Mar 17 10:59:09 CET 2011 Timsen

On Mar 16, 2011, the "Clonlee" ran aground close to a South Shields beach when running down the Tyne. An electrical fault caused a power failure at about 1.15a.m. The vessel, with 12 crew on board, drifted before running aground on sand near to Littlehaven beach. Tugs were on scene while work to lighten the load was being carried out ahead of the tide coming in at 10 a.m. The vessel was able to free itself and continued its journey to the Port of Tyne. Report with video: http://www.shieldsgazette.com/news/drama_as_ship_runs_aground_in_fog_1_3186086

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data