Allgemeine Informationen

IMO:
9399832
MMSI:
636015145
Rufzeichen:
A8YW3
Breite:
46.0 m
Länge:
258.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Tankship
Ship type:
Flagge:
Liberia
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moored
Kurs:
331.6° / -128.0
Kompasskurs:
511.0° / -128.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Gebiet:
North Europe
Zuletzt empfangen::
2024-07-07
vor 2 Min
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 4 Min
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2022-01-13
905d 11h 42m
2021-04-21
1172d 1h 39m
2016-02-12
2016-02-12
6m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
-
-
-

Die neuesten Nachrichten

Offshore procession vessel broke lose from its mooring

Mon Dec 26 19:35:03 CET 2016 Timsen

On Dec 26, 2016, at 9.15 a.m. the "OSX 1" broke lose from her mooring in stormy winds in the Rosfjord and was about to drift towards oil rigs in Lyngdal. Both the ship and the platforms were moored in the bay. The ship still was kept by three of its four anchors, and the crew worked to get a new mooring. Several tugs were called to secure it. At 10.00 four tugs had reached the ship, and one more was expected at noon. The offshore processing vessel had drifted into the fjord but was at anchor at the bow. Two tugs held it against the wind. Coastguard, police, losholdermann, fire brigde and the Intermunicipal Committees for Acute Pollution (IUA) was briefed on the matter and were on site. At noon the ship was under control. The tugs "FFS Achilles", which was later replaced by the "BB Connector", and the "FFS Atlas" remained connected as the new mooring could only be established once the wind had subsided. Norwegian reports with photos: http://www.fvn.no/nyheter/lokalt/Skip-slet-seg-fra-fortoyningen-695805b.html https://www.nrk.no/sorlandet/fryktet-skip-kunne-treffe-oljerigg-1.13292174

OGPar continues Tubarao Azul test

Fri May 23 08:17:59 CEST 2014 arnekiel

Bankrupt Brazil independent Oleo e Gas Participacoes (OGPar) has extended its agreement for the OSX-1 floating production, storage and offloading unit, which has been conducting an extended well test at the Tubarao Azul field. Source : Upstream

FPSO OSX-1 Begins Journey Toward Oil and Gas Production in Brazil

Mon Aug 22 17:21:54 CEST 2011 arnekiel

PSO OSX-1, the first floating production, storage and offloading vessel in OSX’s fleet, has concluded its conversion in Singapore and set sail for Brazil, Maritime Executive reports. The journey is estimated to take 40 to 50 days. The FPSO OSX-1 is commissioned to produce the first oil for our client OGX Petróleo e Gás Ltda. (OGX), which is expected to start oil production during the fourth quarter of 2011. Chartered by OGX for a period of 20 years at an average day rate of US$ 263,000, FPSO OSX-1 will be employed in the Waimea accumulation, in the Campos Basin. http://www.maritime-executive.com/article/fpso-osx-1-begins-journey-toward-oil-and-gas-production-in-brazil

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data