Allgemeine Informationen

IMO:
9211975
MMSI:
235000864
Rufzeichen:
ZQYC3
Breite:
16.0 m
Länge:
93.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Other Ship
Ship type:
Flagge:
United Kingdom
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
84.1° / 0.0
Kompasskurs:
85.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moving
Gebiet:
Inner Seas
Zuletzt empfangen::
2025-07-01
vor 1 Std
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 2 Std
Source:
T-AIS

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2025-06-30
2025-07-01
9h 27m
2025-06-30
2025-06-30
42m
2025-06-29
2025-06-29
29m
2025-06-29
2025-06-29
43m
2025-06-28
2025-06-28
44m
2025-06-27
2025-06-28
9h 42m
2025-06-27
2025-06-27
57m
2025-06-26
2025-06-26
53m
2025-06-25
2025-06-26
9h 51m
2025-06-25
2025-06-25
49m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Liverpool Approach
2025-04-24
Ankommen
Liverpool Approach
2025-03-11
Abfahren
Liverpool Approach
2024-03-08
Ankommen
Liverpool Approach
2024-02-13
Abfahren
Liverpool Approach
2023-05-27
Ankommen
Liverpool Approach
2023-05-03
Abfahren
Liverpool Approach
2023-05-03
Ankommen
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Temporary repair to bow visor

Mon Jun 23 10:11:47 CEST 2025 Timsen

On June 21, a temporary repair has been carried out at the bow visor of the 'Hebrides', serving on the route Uig-Tarbert-Lochmaddy. Until July 2, contractors were to attend the ferry to conduct further inspections, starting on July1 and 2. An amended timetable will continue to operate up to and including July 2.

Hebrides to be removed from service for repairs

Tue Jun 10 10:41:06 CEST 2025 Timsen

The 'Hebrides' will be removed from service from June 30 to July 3 in order to allow inspection of the bow visor. During this period, the'Alfred' will operate an amended timetable on the Little Minch route. The 'Hebrides' had suffered two cracks in her bow visor starboard arm. Due to location of these cracks, the visor cannot be operated, and CalMac was unable to operate it until a full inspection has been conducted. As a result, the vessel is currently operating stern loading only which is increasing turnaround times resulting in service disruption including cancellations. During this period, vehicles towing caravans/trailers, coaches and commercial vehicles will be required to reverse either on or off the vessel. The 'Alfred' will operate an amended timetable on the Little Minch route during the inspections. Timetables are being finalised and will be shared as soon as possible. The following sailings have been cancelled as a result of the amended timetable: June 13, 20 & 27 Departure Lochmaddy – 8:40 p.m. Arrival Uig – 10:25 p.m. Departure Uig – 10:40 p.m. Arrival Lochmaddy – 12:25 a.m. The inspection will take place at Stornoway, and a repair plan, including any temporary repairs, will be agreed. A full repair will not take place until the vessel’s next annual overhaul in early 2026. As part of the inspection, CalMac will look at what temporary repairs can be completed, and this will inform deployment and timetables from July 4 onwards. There are six hatches that need to be removed to allow a full inspection of the bow visor, with this work taking 12-14 hours per hatch. This means it is not possible to conduct the inspection while the vessel is in service.

Ferry suffered main engine issue

Thu Jun 05 18:11:19 CEST 2025 Timsen

The 'Hebrides', serving on the route Uig-Tarbert, suffered a technical issue with the starboard main engine on June 1. Engineers were to carry out a repair on the arrival in Uig. s a result of this, the 7:55p.m.departure from the port was delayed. The ferry finally departed Uig at 8.30 p.m., 35 mins late. with an ETA at Tarbert as of 10.10 p.m. On June 2. due to the technical issue with the starboard main engine, the service had to be suspended with engineers again working on resolving the issue. After repairs have been successful, the vessel operated a delayed 09:50 sailing from Uig at 4:30 p.m.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data