GOLDEN EAGLEverschrottet
Kurs/Position
Die letzten Häfen
Die letzten Wegpunkte
Die neuesten Nachrichten
Beached
Beached at Gadani 09.05.21 https://www.facebook.com/photo?fbid=246515830592242&set=pcb.10160574728548943
arrived Gadani Anchorage
arrived Gadani Anchorage 03.05.21
Damaged ship arrived at Nemrut Bay
On Feb 20, 2018, at 6.50 p.m. the "Black Eagle" arrived at Nemrut Bay. The ship carrying 6800 metric tonnes of steel scrap, had allided with fish farm cages, while departing from Ashdod port on Jan 25 at 01.20 a.m. The steering machine was distorted and severely damaged. The propeller blades were lightly bent and the vessel became unseaworthy. It was towed to its designated discharge port Nemrut Bay on Feb 8 and shifted from the pier to an anchorage under tow on Feb 23. The vessel was towed into the Sefine Shipyard at Altinova on Feb 28 for repairs. On March 19 the ship shifted to the Yasarsan Shipyard in Altinova.
News schreiben