Allgemeine Informationen

IMO:
7912525
MMSI:
237363700
Rufzeichen:
SX8621
Breite:
15.0 m
Länge:
87.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Passenger ship
Ship type:
Flagge:
Greece
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
263.0° / -128.0
Kompasskurs:
511.0° / -128.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Marmarion (Marmarion Port)
Gebiet:
Aegean Sea
Zuletzt empfangen::
2025-07-19
vor 1 Min
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 8 Std
Source:
T-AIS

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2025-07-18
7h 36m
2025-07-18
2025-07-18
22m
2025-07-18
2025-07-18
19m
2025-07-18
2025-07-18
3h 8m
2025-07-17
2025-07-18
9h 57m
2025-07-17
2025-07-17
26m
2025-07-17
2025-07-17
5h 28m
2025-07-16
2025-07-17
10h 1m
2025-07-16
2025-07-16
24m
2025-07-16
2025-07-16
5h 27m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
-
-
-

Die neuesten Nachrichten

Ferry had to abort sailings due to fire in Rafina

Fri Jul 04 10:06:19 CEST 2025 Timsen

On July 3, 2025, at noon, the Port Authority of Karystos was informed by the Greek Coastal Administration that following a request from the Unified Coordination Center for Operations and Crisis Management due to a fire n the Municipality of Rafina-Pikermi, the 'Evia Star' could not sail to the port of Rafina. The ship, which was operating the Marmari-Rafina route with 125 passengers and 17 crew members on board, returned to the port of Marmari. The remaining scheduled routes of the ship remained unexecuted.

Engine failure in Marmaris

Tue Sep 11 09:56:47 CEST 2018 Timsen

In the afternoon hours of Sep 10, 2018, the Port Authority of Karystos was informed by the captain of the "Evia Star" that the ferry had suffered a failure of the left main engine. The scheduled sailing from Marmaris to Rafina was taken over by the "Panorama". The "Evia Star" was detained the damage was repaired and a class certificate was provided by the shipowner.

Ferry lost anchor in Rafina

Fri Aug 03 10:13:39 CEST 2018 Timsen

In the morning of Aug 2, 2018, the Central Port Authority of Rafina was informed about the loss of the port side bow anchor of the "Evia Star" during the arrival at the port , coming from Marmari.The ferry was detained while it was inspected and allowed it to continue its voyage after the renewal of the class certification.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data