Allgemeine Informationen

IMO:
MMSI:
367465960
Rufzeichen:
WDF5669
Breite:
10.0 m
Länge:
20.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Towing Vessel
Ship type:
Flagge:
United States of America
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
211.7° / -128.0
Kompasskurs:
511.0° / -128.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Morgan City (Morgan City Port)
Gebiet:
United States
Zuletzt empfangen::
2024-07-08
vor 1 Min
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 6 Min
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-07-08
9h 27m
2024-07-03
2024-07-07
4d 12h 19m
2024-06-28
2024-06-30
2d 1h 56m
2024-06-28
2024-06-28
10m
2024-06-24
2024-06-24
8h 43m
2024-06-22
2024-06-22
8h 21m
2024-06-16
2024-06-22
5d 8h 10m
2024-06-16
2024-06-16
51m
2024-06-15
2024-06-15
8m
2024-06-14
2024-06-14
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Morgans Point
2023-06-17
Ankommen
Morgans Point
2023-06-16
Abfahren
Morgans Point
2023-06-15
Ankommen
Morgans Point
2023-06-06
Abfahren
Morgans Point
2023-06-04
Ankommen
Morgans Point
2023-06-03
Abfahren
Morgans Point
2023-06-02
Ankommen
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

CROSBY CARRIER

Sun Aug 01 22:00:42 CEST 2010 Timsen

48,800 feet of containment boom and 11,000 feet of sorbent boom are deployed now as well as 193 personnel, 2 helicopters, and a combination of 31 skimmers, boats and barges are responding to the incident. Oil skimming and recovery operations are ongoing in Mud Lake. Approximately 3 barrels, or 144 gallons of oily-water mix, has been recovered. - The required equipment for the firefighting barge has been properly secured to the barge and tested; - The Chevron and BP pipelines in the area have been marked to allow the responders to visually see their locations and ensure that no further damage is done from the temporary spuds that are used to anchor the support vessels; - A hydrographic survey is scheduled to be completed early July 31 which will ensure there is sufficient water depth for the response vessels; - A replacement crane barge was ordered and arrived Friday in Lafitte, La. Wild Well Control Inc. has been designated as the prime contractor to secure the leaking wellhead.

CROSBY CARRIER

Thu Jul 29 09:53:28 CEST 2010 Timsen

Update: http://www.d8externalaffairs.com/go/doc/425/832263/

CROSBY CARRIER

Wed Jul 28 09:51:47 CEST 2010 Timsen

USCG report with photos of burning wellhead: http://www.d8externalaffairs.com/go/doc/425/827283/

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data