Allgemeine Informationen

IMO:
9922225
MMSI:
538009956
Rufzeichen:
V7A5389
Breite:
26.0 m
Länge:
161.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Tankship
Ship type:
Flagge:
Marshall Islands
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
275.7° / -10.0
Kompasskurs:
212.0° / -10.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
anchorage
Gebiet:
Bight of Benin
Zuletzt empfangen::
2024-10-06
vor 2 Min
Source:
T-AIS
Von:
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 8 Std
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-10-02
2024-10-05
2d 23h 47m
2024-09-15
2024-09-16
1d 3h 27m
2024-09-11
2024-09-12
21h 56m
2024-08-24
2024-08-28
3d 15h 27m
2024-08-23
2024-08-24
1d 1h 14m
2024-08-09
2024-08-10
1d 3h 45m
2024-07-19
2024-07-23
3d 18h 27m
2024-07-06
2024-07-10
3d 21h 18m
2024-07-02
2024-07-06
4d 2h 43m
2024-06-25
2024-06-29
3d 4h 21m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
La Plata Approach
2024-09-16
Abfahren
La Plata Approach
2024-09-15
Ankommen
Canary Islands
2024-05-07
Ankommen
Strait of Gibraltar
2024-05-05
Ankommen
Isla de Alboran
2024-05-04
Abfahren
Isla de Alboran
2024-05-03
Ankommen
Strait of Gibraltar
2024-05-01
Abfahren
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Tanker accused of illegally lifting a butane cargo

Mon Jun 12 13:07:13 CEST 2023 Timsen

The 'Barumk Gas', which had left Bonny on June 9, 2023, and was anchored in Ghana’s Tema port on June 11, was to be seized after ExxonMobil was accused of illegally lifting a butane cargo at the Bonny Terminal, without NMDPRA authorisation. The company was accused to have destroyed the locks on the sea-line valve whose keys were in the custody of the Authority. The armed forces should “urgently prevent” the Barumk Gas’ sailing “until investigations into the matter are concluded”. There has been regulatory tension in Nigeria between NMDPRA and the Nigerian Upstream Petroleum Regulatory Commission (NUPRC). The Petroleum Industry Act (PIA) caused a degree of uncertainty in this regard. Exxon produces NGLs from its Oso field at a facility on Bonny Island.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data