Allgemeine Informationen

IMO:
9361378
MMSI:
209530000
Rufzeichen:
5BEM5
Breite:
14.0 m
Länge:
111.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Cargo Ship
Ship type:
Flagge:
Cyprus
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
228.3° / 0.0
Kompasskurs:
229.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moving
Gebiet:
Gulf of Finland
Zuletzt empfangen::
2025-02-12
vor 1 Min
Source:
T-AIS
Von:
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 5 Min
Source:
T-AIS

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2025-02-10
2025-02-12
1d 11h 11m
2025-01-26
2025-01-27
1d 19m
2025-01-16
2025-01-17
1d 4h 41m
2025-01-11
2025-01-13
2d 5h 45m
2025-01-06
2025-01-06
18h 35m
2025-01-01
2025-01-03
2d 38m
2024-12-29
2024-12-30
19h 42m
2024-12-26
2024-12-27
1d 9h 21m
2024-12-22
2024-12-23
20h 59m
2024-12-20
2024-12-20
12h 28m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Hanko FI
2025-02-09
Abfahren
Ristna EE
2025-02-09
Abfahren
Swinoujscie Approach
2025-02-06
Abfahren
Swinoujscie Approach
2025-01-30
Ankommen
Ristna EE
2025-01-28
Ankommen
Hanko FI
2025-01-28
Ankommen
Hanko FI
2025-01-26
Abfahren
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Grounding off Hoefn

Tue Dec 11 12:21:36 CET 2018 Timsen

The "Amber" ran aground on a sandbar, when entering the port of Hornafjordur in the morning of Dec 9, 2018. The ship was loaded with a cargo of salt and had sailed from Ceuta on Dec 1. The process to refloat the vessel with the evening?s high tide did not work out. The ship was refloated with the flood on Dec 11 and berthed in Hoefn at 11.10 a.m.

Repairs of fire damage completed

Thu Jan 25 12:25:39 CET 2018 Timsen

The fire affected areas of the "Amber" have been sand-blasted and painted during its stay at Astilleros Guadalquivir at the port of Seville. Repairs were expected to be completed on Jan 25 and an inspector was due to visit the vessel then.

Ship under repair at Seville after fire

Sat Jan 13 18:08:03 CET 2018 Timsen

The Astilleros del Guadalquivir was chosen to repair the "Amber" the cargo of which had caught fire in Dec 31, 2017, in the Port of Seville due to a fermentation process. On Jan 13 the ship shifted to the Armament Dock so that repairs could be started which were expected to be completed on Jan 16. In addition to repairing the affected part of the cargo hold, the workers will clean and paint it. The ship had transported fermented beet product, and due to humidity, a spontaneous combustion had occurred. Spanish report with photo: http://www.20minutos.es/noticia/3233900/0/astilleros-trabajan-reparar-buque-mercante-cuya-bodega-se-incendio-dia-nochevieja-puerto/#xtor=AD-15&xts = 467263

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data