Allgemeine Informationen

IMO:
7944762
MMSI:
219000558
Rufzeichen:
OZLP2
Breite:
12.0 m
Länge:
39.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Other Ship
Ship type:
Flagge:
Denmark
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
21.0° / 0.0
Kompasskurs:
307.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Roenne (Rönne Port)
Gebiet:
Denmark
Zuletzt empfangen::
2024-10-23
vor 1 Min
Source:
T-AIS
Von:
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 3 Min
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-10-23
4h 26m
2024-10-23
2024-10-23
1h 7m
2024-10-22
2024-10-23
16h 23m
2024-10-22
2024-10-22
11m
2024-10-22
2024-10-22
1h 14m
2024-10-22
2024-10-22
9m
2024-10-21
2024-10-22
16h 52m
2024-10-21
2024-10-21
1h 1m
2024-10-20
2024-10-21
12h 25m
2024-10-20
2024-10-20
56m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Mecklenburg Bay
2024-10-09
Abfahren
Fehmarn Nord
2024-10-09
Ankommen
Great Belt
2023-04-04
Ankommen
Great Belt
2023-04-02
Abfahren
Storebaelt
2023-04-02
Abfahren
Storebaelt
2022-12-07
Ankommen
Great Belt
2022-12-07
Ankommen
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Repair won't delay dredging work

Mon Nov 02 10:19:31 CET 2015 Timsen

The electrical fire on board the "Grete Fighter" brought in to carry out work at Wemyss Bay pier was not expected to delay major repairs. The blaze broke out in the engine room of the dredger on Oct 26 and damaged the vessel’s main engine and one diesel generator when the ship was near Wemyss Bay. It lost propulsion power as a result of the incident, and two tugs had to be dispatched to tow the vessel to Greenock’s Great Harbour, where local firefighters used thermal imaging cameras wto ensure there was no risk of the blaze re-igniting, and then to the Inchgreen repair facility in Port Glasgow. Repairs were expected to take around four weeks. Dredging work at the pier had been due to start in December, but the ship had been brought in in the hope of making an earlier start to that aspect of the work. Report with photo: http://www.buteman.co.uk/news/local-headlines/fire-on-ship-won-t-delay-wemyss-bay-work-1-3932740

Fire on dredger

Wed Oct 28 09:37:46 CET 2015 Timsen

Rescue services were alerted after fire broke out in the engine room of the "Grete Fighter" on the Clyde on Oct 26. 2015, at 6.20 p.m. The dredger was off Wemyss Bay at that time. The ship's own carbon dioxide firefighting system extinguished the fire. The tug "Ayton Cross" was sent to tow the "Grete Fighter" to Inchgreen, where fire crews and a Coastguard unit attended in the Great Port of Greenock as a precaution once the ship was berthed.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data